Difference between revisions of "GlueX BeamTests"

From GlueXWiki
Jump to: navigation, search
(Fall 2018 and Spring 2019 Hall D)
Line 7: Line 7:
  
 
# [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=3590 Test of the PWO calorimeter prototype using Hall D Pair Spectrometer]
 
# [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=3590 Test of the PWO calorimeter prototype using Hall D Pair Spectrometer]
 
== FCAL ==
 
 
=== 2011 Hall B Run ===
 
 
* [[2011 Hall B FCAL Beam Test]] (includes minutes from our 'Beam Test Group Meetings')
 
  
  
Line 28: Line 22:
 
# [[BCAL Beam Tests 2012]]
 
# [[BCAL Beam Tests 2012]]
 
# [[2011 Hall B Bcal Goals]]
 
# [[2011 Hall B Bcal Goals]]
 +
 +
 +
== FCAL ==
 +
 +
=== 2011 Hall B Run ===
 +
 +
* [[2011 Hall B FCAL Beam Test]] (includes minutes from our 'Beam Test Group Meetings')
 +
 +
  
 
=== 2006 Hall B Run and Cosmics ===
 
=== 2006 Hall B Run and Cosmics ===
  
 
* [[Beam/Cosmics Tests]]
 
* [[Beam/Cosmics Tests]]

Revision as of 17:35, 4 September 2019

GlueX Beam Tests

PWO Calorimeter Prototype

Fall 2018 and Spring 2019 Hall D

(test electronics and compare light yield for SICCAS and CRYTUR crystals)

  1. Test of the PWO calorimeter prototype using Hall D Pair Spectrometer


Pair Spectrometer

2012 Hall B Run

  1. Beam test of the pair spectrometer prototype


BCAL

2012 Hall B Run

  1. BCAL Beam Tests 2012
  2. 2011 Hall B Bcal Goals


FCAL

2011 Hall B Run


2006 Hall B Run and Cosmics