Difference between revisions of "GlueX Start Counter Meeting, February 9, 2012"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda: add drawing from Chuck)
Line 12: Line 12:
 
#* [[Conference Call with Hamamatsu Representatives, January 5, 2012|Conference call with Hamamatsu representatives]]
 
#* [[Conference Call with Hamamatsu Representatives, January 5, 2012|Conference call with Hamamatsu representatives]]
 
#* [http://www.jlab.org/Hall-D/procurements/start_counter_sipm/Quote%2328298,%20SMD%20MPPC.pdf Quote from Hamamatsu]
 
#* [http://www.jlab.org/Hall-D/procurements/start_counter_sipm/Quote%2328298,%20SMD%20MPPC.pdf Quote from Hamamatsu]
 +
#* [https://halldweb1.jlab.org/talks/2012-1Q/SC_LAYOUT_1_26_12.pdf Drawing from Chuck]
 
# Contract Status
 
# Contract Status
 
# Simulation Status
 
# Simulation Status

Revision as of 10:29, 26 January 2012

GlueX Start Counter Meeting
Thursday, January 26, 2012
10 am EST
JLab: CEBAF Center, Room F326

Agenda

  1. Announcements
  2. Review minutes from previous meeting
  3. Prototype Report
  4. SiPM configuration
  5. Contract Status
  6. Simulation Status

Communication Information

Video Conferencing

Slides

Talks can be deposited in the directory /group/halld/www/halldweb1/html/talks/2012-1Q on the JLab CUE. This directory is accessible from the web at https://halldweb1.jlab.org/talks/2012-1Q/ .