Revision as of 10:13, 21 April 2014
Present: Chris Keith, Dave Meekins, Josh Pierce, James Brock, Matt Marchlik, Dave Butler, Alexandre Deur, Tim Whitlatch
Contents
Minutes from last mtg https://halldweb1.jlab.org/wiki/index.php/GlueX_Target_Design_Mtg,_Mar_26,_2014
Agenda
- Where are we now? Media:Target labor.pdf
- Cryo hardware status
- Gas system status
- Exhaust from pressure relief
- Plumbing on cart
- pressure system documentation
- Storage tanks
- 3D model/drawings Media:Target assy.pdf
- Target/Start counter interface
- Vacuum system update
- Flange config
- Controls status
- updated P&I
- changes for subcooled config
- Installation cart update Media:Target cart.jpg
- Tank config
- Lifting
- Controls/panel config
- Alignment features
- Scattering chamber status
- Cell Fabrication Status
- thermometry
- Spare cell
- Schedule
- Readiness review
- Assy/test in EEL
- Install/test in Hall
Info
- P&I Diagram Media:Target P&I.pdf
- Controls logic Media:Target controls.pdf
- Dave's SOW Media:Target new SOW.pdf
- Dave's Calcs Media:Target calcs1.pdf Media:Target calcs2.pdf
- Dave's FMEA Media:Target latest FMEA.pdf