Difference between revisions of "GlueX Target Design Mtg, April 21, 2014"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
Line 18: Line 18:
 
** updated P&I
 
** updated P&I
 
** changes for subcooled config
 
** changes for subcooled config
* Installation cart update
+
* Installation cart update [[Media:Target cart.jpg]]
 
** Tank config
 
** Tank config
 
** Lifting
 
** Lifting

Revision as of 10:13, 21 April 2014

Present: Chris Keith, Dave Meekins, Josh Pierce, James Brock, Matt Marchlik, Dave Butler, Alexandre Deur, Tim Whitlatch

Minutes from last mtg https://halldweb1.jlab.org/wiki/index.php/GlueX_Target_Design_Mtg,_Mar_26,_2014

Agenda

  • Where are we now? Media:Target labor.pdf
  • Cryo hardware status
  • Gas system status
    • Exhaust from pressure relief
    • Plumbing on cart
    • pressure system documentation
    • Storage tanks
  • 3D model/drawings Media:Target assy.pdf
  • Target/Start counter interface
  • Vacuum system update
    • Flange config
  • Controls status
    • updated P&I
    • changes for subcooled config
  • Installation cart update Media:Target cart.jpg
    • Tank config
    • Lifting
    • Controls/panel config
    • Alignment features
  • Scattering chamber status
  • Cell Fabrication Status
    • thermometry
    • Spare cell
  • Schedule
    • Readiness review
    • Assy/test in EEL
    • Install/test in Hall

Info


Minutes

Action Items