Difference between revisions of "JEF meeting, April 12, 2024"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
Line 25: Line 25:
 
** - Adding ECAL (and updating FCAL) translation table in the TT.DB  (needed for EPICS scalers)  
 
** - Adding ECAL (and updating FCAL) translation table in the TT.DB  (needed for EPICS scalers)  
 
* '''Installation of the FCAL2 detector & integration to GlueX''' -- Sasha / Vlad / Hakob / Laveen  
 
* '''Installation of the FCAL2 detector & integration to GlueX''' -- Sasha / Vlad / Hakob / Laveen  
** Preparing safety documents. The following ePASes have been submitted and approved -- Sasha and Vlad
+
** All ePASes are ready for the installation -- Sasha and Vlad
*** Installation of the ECAL LMS
+
*** - need to prepare one for testing dividers and maintenance
*** Installation of cables and dividers,
+
*** Beam tests with the PS test setup
+
*** Preparing ECAL cables (EEL126)
+
*** Fabrication of calorimeter prototypes (EEL126)
+
*** Testing ECAL dividers (EEL118) (approved in January)
+
 
** Installation of the LMS  
 
** Installation of the LMS  
 
*** 1132 fibers have been installed [https://logbooks.jlab.org/entry/4270174]
 
*** 1132 fibers have been installed [https://logbooks.jlab.org/entry/4270174]

Revision as of 09:01, 12 April 2024

Meeting time and location:

Agenda

  • Preparation of parts for ECAL -- Sasha
    • - signal cables - done
    • - signal patch panel [1] - done
    • - HV short cables: received, checked, labeled (last week)
    • - HV long cable, 18 ready (out of 36)
    • - HV distribution boards: in preparation
    • - LV cables: 100 cables received, 640 cables in total
    • - LV distribution boards [2]. Have to populate with connectors, and design a box around the PCB
  • Ongoing projects
    • - Bundling short cables (groups of 7, 7, and 6 cables): signal (done), HV (done), LV (29 layers done, waiting for cables)
    • - Tested and labeled all HV cables ! and about 100 LV cables [3]
      • finished: LV - 13 layers, HV - 18 layers, signal - 9 layers (40 in total out of 120) [4][5]
  • Testing of PMT dividers -- Sasha / Vlad / George / Mindy
    • - Testing procedure [6]
    • - Mindy has finished with preparing all sockets (~1650) !
    • - All dividers have been fabricated
    • - Need to remove power regulators on about 200 dividers
    • - George has tested about 1400 dividers [7].
    • - Adding ECAL (and updating FCAL) translation table in the TT.DB (needed for EPICS scalers)
  • Installation of the FCAL2 detector & integration to GlueX -- Sasha / Vlad / Hakob / Laveen
    • All ePASes are ready for the installation -- Sasha and Vlad
      • - need to prepare one for testing dividers and maintenance
    • Installation of the LMS
      • 1132 fibers have been installed [8]
    • Cable and divider installation [9][10][11]
    • Power installation on the platform has been completed [12]
    • Detector installation page
    • Other hardware projects
      • --prototype of the ECAL veto counter
      • --study shower profile using PS (also transition region between lead tungstate and LG modules (?) )
  • Analysis/Simulation
  • FCAL2 poster for open house?
    • JEF/ECAL/FCAL poster
    • exhibit stand (modules, PMTs, etc.)