Difference between revisions of "JEF meeting, April 7, 2023"
From GlueXWiki
(→Agenda) |
(→Agenda) |
||
Line 38: | Line 38: | ||
** [https://halldweb.jlab.org/wiki/index.php/FCAL_Installation Detector installation page] | ** [https://halldweb.jlab.org/wiki/index.php/FCAL_Installation Detector installation page] | ||
** Updates from the meetings with Tim's group [https://halldweb.jlab.org/wiki/index.php/FCAL_2_Design_Meetings] | ** Updates from the meetings with Tim's group [https://halldweb.jlab.org/wiki/index.php/FCAL_2_Design_Meetings] | ||
− | :: | + | :: Discussion of the FCAL2 installation procedures [https://halldweb.jlab.org/wiki/index.php/March_5,_2023,_FCAL_Insert_Installation_Meeting] |
** Manpower and division of tasks | ** Manpower and division of tasks | ||
** [https://halldweb.jlab.org/wiki/index.php/List_of_tasks_and_manpower Projects for summer students] | ** [https://halldweb.jlab.org/wiki/index.php/List_of_tasks_and_manpower Projects for summer students] |
Revision as of 09:23, 7 April 2023
Meeting time and location:
- 9:30 am EST (JLab time) remote only
- Zoom meeting ID: 161 050 9142 Passcode: 004965
Agenda
Meeting time and location:
- 9:30 am EST (JLab time) remote only
- Zoom meeting ID: 161 050 9142 Passcode: 004965
Agenda
- Preparation of parts for FCAL2 modules -- Sasha
- Available crystals:
- 1450 (modules)
- 32 (ready for fabrication)
- 40 (installed on CCAL)
- (some CCAL crystals from the inner part will not be used for the FCAL2)
- 95 expect to receive from CRYTUR in May [1] Expect to start shipping crystals in the 2nd week of April.
- Total 1617
- Disassemble the CCAL prototype
- Available crystals:
- George (DSG group) is unwrapping CCAL modules and removing LMS caps. He'll also work on preshaping ESR reflectors (100 pcs) for CRYTUR.
- Mindy (DSG group) 5 modules wrapped. She continues soldering wires to sockets
- Fix length of LV and HV cables inside the dark box. Chris S. will place an order.
- Got quotes for optical fibers for LMS, will order them today.
- Module fabrication -- Sasha
- Fabricated modules: Total 1482
- Currently available for fabrication: 5 (modules will be available during next week)
- Fabricated modules: Total 1482
- Testing of PMT dividers -- Sasha / Arshak
- FCAL2 modules with dividers installed on the CCAL [3]
- Installation of the FCAL2 detector & integration to GlueX -- Sasha / Arshak
- Detector installation page
- Updates from the meetings with Tim's group [4]
- Discussion of the FCAL2 installation procedures [5]
- Manpower and division of tasks
- Projects for summer students
- Summer Students (2023)
- Disassembling FCAL
- Light Monitoring System -- Arshak
- Simulations/Analysis