Difference between revisions of "JEF meeting, August 19, 2022"

From GlueXWiki
Jump to: navigation, search
(Agenda)
m (Minutes)
 
(18 intermediate revisions by 3 users not shown)
Line 6: Line 6:
  
 
* Simulations/Analysis
 
* Simulations/Analysis
 +
** [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=5707 FCAL2 Photon Classification Feature Space] -- Azizah
 +
*** True photons and splitoffs present differently in the FCAL and FCAL2.
 
* Preparation of parts for FCAL2 modules -- Sasha
 
* Preparation of parts for FCAL2 modules -- Sasha
** [https://halldweb.jlab.org/wiki/index.php/CRYTUR Discuss possibility to order 20 more CRYTUR crystals during this F.Y. Have already received 5 more crystals from physics division].  
+
** Crystals. [https://halldweb.jlab.org/wiki/index.php/CRYTUR] Discuss possibility to order 20 more CRYTUR crystals during this F.Y. Have already received 5 more crystals from physics division].  
 +
*** currently available/ordered + CCAL:  1593 + (9)  (need more spares)
 
** Meeting with the DSG group: Mindy and George will continue working on the project in September
 
** Meeting with the DSG group: Mindy and George will continue working on the project in September
**[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/part_preparation.pdf Preparation of parts][https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/6_17_22/students1.jpg][https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/6_17_22/students2.jpg][https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/6_17_22/students3.jpg]
+
**[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/part_preparation.pdf Preparation of parts][https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/6_17_22/students1.jpg][https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/6_17_22/students2.jpg][https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/6_17_22/students3.jpg]. Remaining components:
*** Need: 300 brass assemblies (Keith and Chris will continue to work on them. Waiting for straps)
+
*** 300 brass assemblies (Keith and Chris will continue to work on them,  waiting for straps)
*** Expect to receive remaining 200 light guides during a couple of next weeks.
+
*** 200 light guides, will be delivered during a couple of next weeks.
*** Need about 400 PMT housing
+
*** 400 PMT housings, expect to receive during next two months (bottleneck now)
** Task for the next week: Perform inventory of all fabricated crystals. Prepare to move to the new lab.
+
**[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/wrapped/wrapped_crytur.pdf Wrapped CRYTUR crystals:] 682
**[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/wrapped/wrapped_crytur.pdf Wrapped CRYTUR crystals:] 684
+
*** <span style="color:#FF0000"> All currently available </span>
*** <span style="color:#FF0000"> All currently available </span> (consider to borrow some spares from NPS)
+
 
* Module fabrication  -- Sasha
 
* Module fabrication  -- Sasha
** Received 85 PMT housings from Tim, they have been honed by Bobby. All of them will be used today.
+
** Received 72 PMT housings from Tim a couple of days ago; used practically all of them
 
** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/fcal_fabrication.pdf  Status of fabrication ]
 
** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/fcal_fabrication.pdf  Status of fabrication ]
** Fabricated modules: <span style="color:#FF0000"> Total 1153 </span>  
+
** Fabricated modules: <span style="color:#FF0000"> Total 1206  (a new milestone)</span>  
*** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/module_fabrication.pdf All SICCAS 577 SICCAS]  
+
*** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/module_fabrication.pdf All SICCAS 576 SICCAS]  
*** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/module_fabrication_crytur.pdf 576 CRYTUR], Remaining: 121
+
*** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/module_fabrication_crytur.pdf 630 CRYTUR], Remaining: 52
 
** Clean room EEL126 [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/8_5_22/eel_shelves.jpg][https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/8_5_22/eel_shelves1.jpg]
 
** Clean room EEL126 [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/8_5_22/eel_shelves.jpg][https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/8_5_22/eel_shelves1.jpg]
 
*** Expect to move to the new lab EEL108 (the same building) [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/8_5_22/eel_108.jpg]
 
*** Expect to move to the new lab EEL108 (the same building) [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/8_5_22/eel_108.jpg]
 
*** Work on amending safety docs
 
*** Work on amending safety docs
 +
** All students will leave during this week (11 students have been working on the project during this summer)
 +
*** <span style="color:#FF0000"> Great job ! </span>
 +
*** (had also a chance to work on the CCAL project [https://logbooks.jlab.org/entry/4031143])
 +
* Updates from the FCAL installation meetings with Tim's group -- Sasha
 +
** [https://halldweb.jlab.org/wiki/index.php/August_10,_2022_FCAL_Insert_Installation_Meeting Meeting in August 10]
 +
** [https://halldweb.jlab.org/wiki/index.php/FCAL_2_Design_Meetings Link to the earlier design meetings]
 +
* Light Monitoring System -- Arshak
  
* Module fabrication -- Sasha
+
=Minutes=
* Light Monitoring System -- Arshak
+
Attendees: Igal, Liping, Arshak, Sasha, Tegan, Zisis, Jon, Jane, Phil, Azizah, Olga, S.T.
 +
* Azizah gave an update on using multi-variate analysis to separate true photons coming from the primary interaction with the target and split-offs due to other interactions
 +
** Used photons from &pi;0 decay from the reaction &omega;&rarr;&pi;+&pi;-&pi;0
 +
** Compared response for FCAL-1 and FCAL-2 geometries
 +
*** Followed approach used by Indiana group for FCAL-1
 +
*** Largest differences between FCAL-1 and FCAL-2 seen in sum-V variable
 +
*** For insert region, also saw differences in the timing variable
 +
** Need to study over/undertraining?
 +
* Zisis mentioned he had a new student working on machine learning using image processing
 +
* Sasha/engineering group/elecronics group periodically meet about installation plan for FCAL-2 (move to more regular meetings?)
 +
** Stacking coordination, quality checks
 +
** Refurbishment of FCAL-1 modules
 +
* Will order 20 crystals this fiscal year
 +
* Need to disassemble COMCAL to meet 1600 crystal need
 +
* Module fabrication continues -- previous week was last week for students
 +
** 1206 completed!
 +
** Still need various components:  brass assemblies, light guides, PMT housing
 +
* Sasha working on contract with GWU for testing PMT dividers
 +
* Arshak continues to work on LMS system to make the light distribution more uniform across the plexiglas plate
 +
** Switched to LEDS attached to plexiglas -- response flatter but still 3x higher light intensity near edges (was ~60x using fibers)
 +
** Goal for uniformity: 10-15% difference
 +
** Try to make final decision regarding approach (FCAL method vs individual fibers to each crystal?) in 3-4 weeks
 +
** Want to monitor light source itself as well -- reference PMT?
 +
** Try out diffusion box idea?
 +
** Divide plexiglas into quadrants?

Latest revision as of 08:55, 22 August 2022

Meeting time and location:

  • 9:30 am EST (JLab time) remote only
  • Zoom meeting ID: 161 050 9142 Passcode: 004965

Agenda

  • Simulations/Analysis
  • Preparation of parts for FCAL2 modules -- Sasha
    • Crystals. [1] Discuss possibility to order 20 more CRYTUR crystals during this F.Y. Have already received 5 more crystals from physics division].
      • currently available/ordered + CCAL: 1593 + (9) (need more spares)
    • Meeting with the DSG group: Mindy and George will continue working on the project in September
    • Preparation of parts[2][3][4]. Remaining components:
      • 300 brass assemblies (Keith and Chris will continue to work on them, waiting for straps)
      • 200 light guides, will be delivered during a couple of next weeks.
      • 400 PMT housings, expect to receive during next two months (bottleneck now)
    • Wrapped CRYTUR crystals: 682
      • All currently available
  • Module fabrication -- Sasha
    • Received 72 PMT housings from Tim a couple of days ago; used practically all of them
    • Status of fabrication
    • Fabricated modules: Total 1206 (a new milestone)
    • Clean room EEL126 [5][6]
      • Expect to move to the new lab EEL108 (the same building) [7]
      • Work on amending safety docs
    • All students will leave during this week (11 students have been working on the project during this summer)
      • Great job !
      • (had also a chance to work on the CCAL project [8])
  • Updates from the FCAL installation meetings with Tim's group -- Sasha
  • Light Monitoring System -- Arshak

Minutes

Attendees: Igal, Liping, Arshak, Sasha, Tegan, Zisis, Jon, Jane, Phil, Azizah, Olga, S.T.

  • Azizah gave an update on using multi-variate analysis to separate true photons coming from the primary interaction with the target and split-offs due to other interactions
    • Used photons from π0 decay from the reaction ω→π+π-π0
    • Compared response for FCAL-1 and FCAL-2 geometries
      • Followed approach used by Indiana group for FCAL-1
      • Largest differences between FCAL-1 and FCAL-2 seen in sum-V variable
      • For insert region, also saw differences in the timing variable
    • Need to study over/undertraining?
  • Zisis mentioned he had a new student working on machine learning using image processing
  • Sasha/engineering group/elecronics group periodically meet about installation plan for FCAL-2 (move to more regular meetings?)
    • Stacking coordination, quality checks
    • Refurbishment of FCAL-1 modules
  • Will order 20 crystals this fiscal year
  • Need to disassemble COMCAL to meet 1600 crystal need
  • Module fabrication continues -- previous week was last week for students
    • 1206 completed!
    • Still need various components: brass assemblies, light guides, PMT housing
  • Sasha working on contract with GWU for testing PMT dividers
  • Arshak continues to work on LMS system to make the light distribution more uniform across the plexiglas plate
    • Switched to LEDS attached to plexiglas -- response flatter but still 3x higher light intensity near edges (was ~60x using fibers)
    • Goal for uniformity: 10-15% difference
    • Try to make final decision regarding approach (FCAL method vs individual fibers to each crystal?) in 3-4 weeks
    • Want to monitor light source itself as well -- reference PMT?
    • Try out diffusion box idea?
    • Divide plexiglas into quadrants?