Line 29: Line 29:
 
** All students will leave during this week (11 students have been working on the project during this summer)
 
** All students will leave during this week (11 students have been working on the project during this summer)
 
*** <span style="color:#FF0000"> Great job ! </span>
 
*** <span style="color:#FF0000"> Great job ! </span>
*** (had also a chance to work on the CCAL project [https://logbooks.jlab.org/entry/4031143/edit])
+
*** (had also a chance to work on the CCAL project [https://logbooks.jlab.org/entry/4031143])
 
* Updates from the FCAL installation meetings with Tim's group -- Sasha
 
* Updates from the FCAL installation meetings with Tim's group -- Sasha
 
** [https://halldweb.jlab.org/wiki/index.php/August_10,_2022_FCAL_Insert_Installation_Meeting Meeting in August 10]
 
** [https://halldweb.jlab.org/wiki/index.php/August_10,_2022_FCAL_Insert_Installation_Meeting Meeting in August 10]
 
** [https://halldweb.jlab.org/wiki/index.php/FCAL_2_Design_Meetings Link to the earlier design meetings]
 
** [https://halldweb.jlab.org/wiki/index.php/FCAL_2_Design_Meetings Link to the earlier design meetings]
 
* Light Monitoring System -- Arshak
 
* Light Monitoring System -- Arshak

Revision as of 00:58, 19 August 2022

Meeting time and location:

  • 9:30 am EST (JLab time) remote only
  • Zoom meeting ID: 161 050 9142 Passcode: 004965

Agenda

  • Simulations/Analysis
  • Preparation of parts for FCAL2 modules -- Sasha
    • Crystals. [1] Discuss possibility to order 20 more CRYTUR crystals during this F.Y. Have already received 5 more crystals from physics division].
      • currently available/ordered + CCAL: 1593 + (9) (need more spares)
    • Meeting with the DSG group: Mindy and George will continue working on the project in September
    • Preparation of parts[2][3][4]. Remaining components:
      • 300 brass assemblies (Keith and Chris will continue to work on them, waiting for straps)
      • 200 light guides, will be delivered during a couple of next weeks.
      • 400 PMT housings, expect to receive during next two months (bottleneck now)
    • Wrapped CRYTUR crystals: 682
      • All currently available
  • Module fabrication -- Sasha
    • Received 72 PMT housings from Tim a couple of days ago; used practically all of them
    • Status of fabrication
    • Fabricated modules: Total 1206 (a new milestone)
    • Clean room EEL126 [5][6]
      • Expect to move to the new lab EEL108 (the same building) [7]
      • Work on amending safety docs
    • All students will leave during this week (11 students have been working on the project during this summer)
      • Great job !
      • (had also a chance to work on the CCAL project [8])
  • Updates from the FCAL installation meetings with Tim's group -- Sasha
  • Light Monitoring System -- Arshak