Difference between revisions of "JEF meeting, August 19, 2022"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
Line 6: Line 6:
  
 
* Simulations/Analysis
 
* Simulations/Analysis
 +
** [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=5707 FCAL2 Photon Classification Feature Space] -- Azizah
 +
*** True photons and splitoffs present differently in the FCAL and FCAL2.
 
* Preparation of parts for FCAL2 modules -- Sasha
 
* Preparation of parts for FCAL2 modules -- Sasha
 
** Crystals. [https://halldweb.jlab.org/wiki/index.php/CRYTUR] Discuss possibility to order 20 more CRYTUR crystals during this F.Y. Have already received 5 more crystals from physics division].  
 
** Crystals. [https://halldweb.jlab.org/wiki/index.php/CRYTUR] Discuss possibility to order 20 more CRYTUR crystals during this F.Y. Have already received 5 more crystals from physics division].  

Revision as of 00:40, 19 August 2022

Meeting time and location:

  • 9:30 am EST (JLab time) remote only
  • Zoom meeting ID: 161 050 9142 Passcode: 004965

Agenda

  • Simulations/Analysis
  • Preparation of parts for FCAL2 modules -- Sasha
    • Crystals. [1] Discuss possibility to order 20 more CRYTUR crystals during this F.Y. Have already received 5 more crystals from physics division].
      • currently available/ordered + CCAL: 1593 + (9) (need more spares)
    • Meeting with the DSG group: Mindy and George will continue working on the project in September
    • Preparation of parts[2][3][4]. Remaining components:
      • 300 brass assemblies (Keith and Chris will continue to work on them, waiting for straps)
      • 200 light guides, will be delivered during a couple of next weeks.
      • 400 PMT housings, expect to receive during next two months (bottleneck now)
    • Wrapped CRYTUR crystals: 682
      • All currently available
  • Module fabrication -- Sasha
    • Received 72 PMT housings from Tim a couple of days ago; used practically all of them
    • Status of fabrication
    • Fabricated modules: Total 1206 (a new milestone)
    • Clean room EEL126 [5][6]
      • Expect to move to the new lab EEL108 (the same building) [7]
      • Work on amending safety docs
    • All students will leave during this week (11 students have been working on the project during this summer)
      • Great job !
      • (had also a chance to work on the CCAL project [8])
  • Updates from the FCAL installation meetings with Tim's group -- Sasha
  • Light Monitoring System -- Arshak