Line 21: Line 21:
 
*** - Received bench for the integrating sphere; machined to the right size [ ]
 
*** - Received bench for the integrating sphere; machined to the right size [ ]
 
** - Radiation tests of the PMT active base [https://halldweb.jlab.org/wiki/index.php/Active_Base_Radiation_Tests]
 
** - Radiation tests of the PMT active base [https://halldweb.jlab.org/wiki/index.php/Active_Base_Radiation_Tests]
** - https://halldweb.jlab.org/detectors/AL/HallD_Racks/
+
** - Inventory database and GUI for installed electronics [https://halldweb.jlab.org/detectors/AL/HallD_Racks/]
 
** - [https://halldweb.jlab.org/detectors/fcal2/installation/students_2023/list_of_students_2023.xlsx Summer Students (2023) ]
 
** - [https://halldweb.jlab.org/detectors/fcal2/installation/students_2023/list_of_students_2023.xlsx Summer Students (2023) ]
 
* '''[[Testing of PMT dividers]]''' -- Sasha / Vlad / Aoran  
 
* '''[[Testing of PMT dividers]]''' -- Sasha / Vlad / Aoran  

Revision as of 18:36, 14 December 2023

eeting time and location:

Agenda

  • Preparation of parts for ECAL -- Sasha
    • - signal cables - done
    • - signal patch panel[1] - done
    • - HV cables: received 165 short cables during this week (965 in total)
    • - HV distribution boards: in preparation
    • - LV cables: received first article of short cables, production started on Dec. 7, expect to receive the first batch in the beginning of January
    • - LV distribution boards. In production
  • Ongoing projects -- Sasha, all
    • - Testing and labeling cables [2], 80 short HV cables testes and labeled during this week.
    • - Prepare modules for the TAC and prototypes (using crystals with some imperfections)
      • 26 modules for TAC and 35 modules for the beam tests are ready
    • - Preparation of the LMS
      • - All fibers are ready for the installation [3]
      • - Installing light-tight covers on the plastic caps [4][5][6][7] Installed 1245 covers.
      • - Received bench for the integrating sphere; machined to the right size [ ]
    • - Radiation tests of the PMT active base [8]
    • - Inventory database and GUI for installed electronics [9]
    • - Summer Students (2023)
  • Testing of PMT dividers -- Sasha / Vlad / Aoran
    • - Testing procedure [10]
    • - Tested 420 dividers [11]
  • Installation of the FCAL2 detector & integration to GlueX -- Sasha / Vlad / Hakob