Line 8: Line 8:
 
** - signal cables: Received all needed long cables. Redid and tested 4 bundles. All cables are ready.
 
** - signal cables: Received all needed long cables. Redid and tested 4 bundles. All cables are ready.
 
** - signal patch panels are ready [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/10_13_2023/signal_patch_panel.jpg ]
 
** - signal patch panels are ready [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/10_13_2023/signal_patch_panel.jpg ]
** - HV cables: have received 330 short cables, have been testes and labeled. 800 cables are ready for installation. Long cables are in production
+
** - HV cables: 800 cables are ready for installation. Long cables are in production
 
** - HV distribution boards: Chris is finalizing design of the distribution board, should order 4 boards soon.
 
** - HV distribution boards: Chris is finalizing design of the distribution board, should order 4 boards soon.
 
** - LV cables: ordered, lead time unclear
 
** - LV cables: ordered, lead time unclear
** - LV distribution boards. The design of the LV distribution board has been finalized. Boards will be ordered during next week.  
+
** - LV distribution boards. The LV distribution boards have been ordered.  
 
** - Optical fibers: received all
 
** - Optical fibers: received all
 
* '''Ongoing projects''' -- Sasha, all
 
* '''Ongoing projects''' -- Sasha, all

Revision as of 10:06, 8 December 2023

Meeting time and location:

Agenda

  • Preparation of parts for ECAL -- Sasha
    • - signal cables: Received all needed long cables. Redid and tested 4 bundles. All cables are ready.
    • - signal patch panels are ready [1]
    • - HV cables: 800 cables are ready for installation. Long cables are in production
    • - HV distribution boards: Chris is finalizing design of the distribution board, should order 4 boards soon.
    • - LV cables: ordered, lead time unclear
    • - LV distribution boards. The LV distribution boards have been ordered.
    • - Optical fibers: received all
  • Ongoing projects -- Sasha, all
  • Testing of PMT dividers -- Sasha / Vlad / Aoran / Boaxin
    • - Testing procedure [7]
    • - Tested 420 dividers [8] (104 last week)
  • Installation of the FCAL2 detector & integration to GlueX -- Sasha / Vlad / Hakob




  • Preparation of parts for ECAL -- Sasha
  • Ongoing projects -- Sasha, all
    • - Preparation of the LMS
  • Testing of PMT dividers -- Sasha / Vlad / Aoran / Boaxin
  • Installation of the FCAL2 detector & integration to GlueX -- Sasha / Vlad / Hakob
  • Lead Glass Efforts -- Malte / Mark / Kevin / Zisis
  • Analysis/Simulation