Difference between revisions of "JEF meeting, December 8, 2023"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
Line 22: Line 22:
 
*** - All fibers are ready for the installation. The plate was machined and polised [https://logbooks.jlab.org/entry/4228633]
 
*** - All fibers are ready for the installation. The plate was machined and polised [https://logbooks.jlab.org/entry/4228633]
 
*** - Installing light tight covers on the plastic caps.  
 
*** - Installing light tight covers on the plastic caps.  
 +
*** - Meeting with Fernando and Chris regarding LED drivers
 
** - Radiation tests of the PMT active base [https://halldweb.jlab.org/wiki/index.php/Active_Base_Radiation_Tests]
 
** - Radiation tests of the PMT active base [https://halldweb.jlab.org/wiki/index.php/Active_Base_Radiation_Tests]
 
** - [https://halldweb.jlab.org/detectors/fcal2/installation/students_2023/list_of_students_2023.xlsx Summer Students (2023) ]
 
** - [https://halldweb.jlab.org/detectors/fcal2/installation/students_2023/list_of_students_2023.xlsx Summer Students (2023) ]
* '''[[Testing of PMT dividers]]''' -- Sasha / Vlad / Aoran / Boaxin
+
* '''[[Testing of PMT dividers]]''' -- Sasha / Vlad / Aoran  
 
** - Testing procedure [https://halldweb.jlab.org/detectors/fcal2/dividers/divider_test_guide.pptx]
 
** - Testing procedure [https://halldweb.jlab.org/detectors/fcal2/dividers/divider_test_guide.pptx]
 
** - Tested 420 dividers [https://halldweb.jlab.org/wiki/index.php/Final_test_of_dividers]
 
** - Tested 420 dividers [https://halldweb.jlab.org/wiki/index.php/Final_test_of_dividers]

Revision as of 10:11, 8 December 2023

Meeting time and location:

Agenda

  • Preparation of parts for ECAL -- Sasha
    • - signal cables: Received all needed long cables. Redid and tested 4 bundles. All cables are ready.
    • - signal patch panels are ready [1]
    • - HV cables: 800 cables are ready for installation. Long cables are in production
    • - HV distribution boards: Chris is finalizing design of the distribution board, should order 4 boards soon.
    • - LV cables: ordered, lead time unclear
    • - LV distribution boards. The LV distribution boards have been ordered.
    • - Optical fibers: received all
  • Ongoing projects -- Sasha, all
  • Testing of PMT dividers -- Sasha / Vlad / Aoran
    • - Testing procedure [7]
    • - Tested 420 dividers [8]
  • Installation of the FCAL2 detector & integration to GlueX -- Sasha / Vlad / Hakob
  • Lead Glass Efforts -- Malte / Mark / Kevin / Zisis
  • Analysis/Simulation