=Minutes=
 +
Attendees: Zisis, Sasha, Bill, Tim W., Liping, Arshak, Olga, Igor, Malte, Igal, Eugene, Jane, S.T.
 +
* All of the COMCAL modules have been unwrapped and are ready to convert to FCAL-2 modules
 +
* PMT housings still missing -- need about 60 (40 + spares)
 +
* Shelf space reorganization in the works -- need enough for temporary storage in hall before stacking
 +
* Received 25 new dividers from Chris S. + ribbon cables for LV
 +
** Constructed 5x5 module array + LV patch panel, ready for installation in hall
 +
** Cooling plates:  checking for water leaks
 +
* Arshak continuing studies with 500 micron fibers -- has bundle of 64 fibers, testing in groups of 12-14
 +
** Uniformity is good (<20%) but had a few outliers
 +
** Need to make decision: plexiglas (cheaper but with potential cross talk issues) and fibers to each module
 +
* Lemo connectors have arrived
 +
* Grand total fabricated modules remains at 1420
 +
* Will have ~10 students helping out in the summer
 +
* Simon gave a brief update on 2&pi;0 background studies, will give talk on software/analysis at collaboration meeting
 +
** Need to make FCAL-2 geometry in reconstruction/simulation more realistic
 +
** Island vs default cluster algorithm
 +
* Igal working on ML (boosted decision tree in TMVA) to suppress background in &eta;&rarr;&pi;0&gamma;&gamma;
 +
* Discussed running JEF with GlueX-III at higher intensity
 +
** Need to understand increased background (simulate at higher rate)
 +
** Need higher trigger threshold (will not work for &eta;&rarr;&pi;0&pi;+&pi;- channel)
 +
** Gain experience with real FCAL-2 next year, then consider JEF extension?

Revision as of 10:18, 13 February 2023

Meeting time and location:

  • 9:30 am EST (JLab time) remote only
  • Zoom meeting ID: 161 050 9142 Passcode: 004965

Agenda

during next week. The CCAL prototype should be ready by the end of next week (?)

Minutes

Attendees: Zisis, Sasha, Bill, Tim W., Liping, Arshak, Olga, Igor, Malte, Igal, Eugene, Jane, S.T.

  • All of the COMCAL modules have been unwrapped and are ready to convert to FCAL-2 modules
  • PMT housings still missing -- need about 60 (40 + spares)
  • Shelf space reorganization in the works -- need enough for temporary storage in hall before stacking
  • Received 25 new dividers from Chris S. + ribbon cables for LV
    • Constructed 5x5 module array + LV patch panel, ready for installation in hall
    • Cooling plates: checking for water leaks
  • Arshak continuing studies with 500 micron fibers -- has bundle of 64 fibers, testing in groups of 12-14
    • Uniformity is good (<20%) but had a few outliers
    • Need to make decision: plexiglas (cheaper but with potential cross talk issues) and fibers to each module
  • Lemo connectors have arrived
  • Grand total fabricated modules remains at 1420
  • Will have ~10 students helping out in the summer
  • Simon gave a brief update on 2π0 background studies, will give talk on software/analysis at collaboration meeting
    • Need to make FCAL-2 geometry in reconstruction/simulation more realistic
    • Island vs default cluster algorithm
  • Igal working on ML (boosted decision tree in TMVA) to suppress background in η→π0γγ
  • Discussed running JEF with GlueX-III at higher intensity
    • Need to understand increased background (simulate at higher rate)
    • Need higher trigger threshold (will not work for η→π0π+π- channel)
    • Gain experience with real FCAL-2 next year, then consider JEF extension?