Difference between revisions of "JEF meeting, February 2, 2024"
From GlueXWiki
(→Agenda) |
|||
Line 10: | Line 10: | ||
** - HV cables: received 1280 in total | ** - HV cables: received 1280 in total | ||
** - HV distribution boards: in preparation | ** - HV distribution boards: in preparation | ||
− | ** - LV cables: | + | ** - LV cables: 150 cables received |
** - LV distribution boards. Received 4 boards, performed initial cehck, need to solder connectors [https://halldweb.jlab.org/detectors/fcal2/cables/lv_distribution/lv_dist_board.jpg ] | ** - LV distribution boards. Received 4 boards, performed initial cehck, need to solder connectors [https://halldweb.jlab.org/detectors/fcal2/cables/lv_distribution/lv_dist_board.jpg ] | ||
** - Optical fibers and parts for the trigger/DAQ have been ordered | ** - Optical fibers and parts for the trigger/DAQ have been ordered | ||
* '''Ongoing projects''' -- Sasha, all | * '''Ongoing projects''' -- Sasha, all | ||
− | ** - Testing and labeling cables | + | ** - Testing and labeling cables, 100 short LV cables tested and labeled during this week. |
** - Prepare modules for the TAC and prototypes (using crystals with some imperfections) | ** - Prepare modules for the TAC and prototypes (using crystals with some imperfections) | ||
*** 26 modules for TAC [https://halldweb.jlab.org/detectors/fcal2/modules_for_prototype/tac_mod.jpg] and 35 modules [https://halldweb.jlab.org/detectors/fcal2/modules_for_prototype/prot_mod.jpg] for the beam tests are ready | *** 26 modules for TAC [https://halldweb.jlab.org/detectors/fcal2/modules_for_prototype/tac_mod.jpg] and 35 modules [https://halldweb.jlab.org/detectors/fcal2/modules_for_prototype/prot_mod.jpg] for the beam tests are ready |
Revision as of 10:06, 2 February 2024
Meeting time and location:
- 9:30 am EST (JLab time) remote only
- Connection information
Agenda
- Preparation of parts for ECAL -- Sasha
- - signal cables - done
- - signal patch panel [1] - done
- - HV cables: received 1280 in total
- - HV distribution boards: in preparation
- - LV cables: 150 cables received
- - LV distribution boards. Received 4 boards, performed initial cehck, need to solder connectors [2]
- - Optical fibers and parts for the trigger/DAQ have been ordered
- Ongoing projects -- Sasha, all
- - Testing and labeling cables, 100 short LV cables tested and labeled during this week.
- - Prepare modules for the TAC and prototypes (using crystals with some imperfections)
- - Preparation of the LMS
- - Need to glue Al flange to the optical fiber
- - Ready for installation [5]
- - Radiation tests of the PMT active base [6]
- Finished tests, working on the tech note
- - Inventory database and GUI for installed electronics
- - Summer Students (2023)
- Testing of PMT dividers -- Sasha / Vlad / Aoran
- Installation of the FCAL2 detector & integration to GlueX -- Sasha / Vlad / Hakob
- Detector installation [9][10][11]
- Installation of the LMS
- Started yesterday (after long delay) [12]
- Had to obtain trainings for operating scissor lift (operation without training violates safety rules) (revealed some issues with the lift when inspected by Joe Thomas)
- Cable and divider installation
- Started yesterday, making a decision how to stretch them [13]
- Still no power on the ECAL platform (expect delay with the development of the trigger/DAQ)
- Detector installation page