Difference between revisions of "JEF meeting, January 5, 2024"
From GlueXWiki
(→Agenda) |
|||
Line 19: | Line 19: | ||
** - Preparation of the LMS | ** - Preparation of the LMS | ||
*** - All fibers are ready for the installation [https://logbooks.jlab.org/entry/4228633] | *** - All fibers are ready for the installation [https://logbooks.jlab.org/entry/4228633] | ||
− | *** - Installing light-tight covers on the plastic caps [https://halldweb.jlab.org/detectors/fcal2/lms/light_tight_caps/lms_lt4.jpg][https://halldweb.jlab.org/detectors/fcal2/lms/light_tight_caps/lms_lt3.jpg][https://halldweb.jlab.org/detectors/fcal2/lms/light_tight_caps/lms_lt1.jpg][https://halldweb.jlab.org/detectors/fcal2/lms/light_tight_caps/lms_lt2.jpg] | + | *** - Installing light-tight covers on the plastic caps [https://halldweb.jlab.org/detectors/fcal2/lms/light_tight_caps/lms_lt4.jpg][https://halldweb.jlab.org/detectors/fcal2/lms/light_tight_caps/lms_lt3.jpg][https://halldweb.jlab.org/detectors/fcal2/lms/light_tight_caps/lms_lt1.jpg][https://halldweb.jlab.org/detectors/fcal2/lms/light_tight_caps/lms_lt2.jpg]. All covers have been installed. |
*** - Received an optical bench for the integrating sphere; machined to the right size [https://halldweb.jlab.org/detectors/fcal2/lms/installation/inst_sphere1.jpg] [https://halldweb.jlab.org/detectors/fcal2/lms/installation/inst_sphere2.jpg] | *** - Received an optical bench for the integrating sphere; machined to the right size [https://halldweb.jlab.org/detectors/fcal2/lms/installation/inst_sphere1.jpg] [https://halldweb.jlab.org/detectors/fcal2/lms/installation/inst_sphere2.jpg] | ||
** - Radiation tests of the PMT active base [https://halldweb.jlab.org/wiki/index.php/Active_Base_Radiation_Tests] | ** - Radiation tests of the PMT active base [https://halldweb.jlab.org/wiki/index.php/Active_Base_Radiation_Tests] |
Revision as of 09:46, 5 January 2024
Meeting time and location:
- 9:30 am EST (JLab time) remote only
- Connection information
Agenda
- Preparation of parts for ECAL -- Sasha
- - signal cables - done
- - signal patch panel [1] - done
- - HV cables: received 165 short cables during this week (965 in total)
- - HV distribution boards: in preparation
- - LV cables: received first article of short cables, production started on Dec. 7, expect to receive the first batch in the beginning of January
- - LV distribution boards. In production
- Ongoing projects -- Sasha, all
- - Testing and labeling cables [2], 80 short HV cables testes and labeled during this week.
- - Prepare modules for the TAC and prototypes (using crystals with some imperfections)
- - Preparation of the LMS
- - Radiation tests of the PMT active base [12]
- - Inventory database and GUI for installed electronics
- - Summer Students (2023)
- Testing of PMT dividers -- Sasha / Vlad / Aoran
- Installation of the FCAL2 detector & integration to GlueX -- Sasha / Vlad / Hakob
- Detector installation [15][16][17]
- Detector survey
- - waiting for survey results
- Detector installation page
- Updates from the meetings with Tim's group [18]
- Meeting with Chris Cuevas regarding installing optical fibers and patch panels
- Installation of electronics [19]
- Abstracts for April'24 APS meeting