* '''Ongoing projects'''  
 
* '''Ongoing projects'''  
 
** - Bundling short cables (groups of 7, 7, and 6 cables): signal (done), HV (done), LV (36 layers done, waiting for cables) [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/04_26_2024]
 
** - Bundling short cables (groups of 7, 7, and 6 cables): signal (done), HV (done), LV (36 layers done, waiting for cables) [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/04_26_2024]
**  - [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/04_26_2024/[[]] Update from Laveen]
+
**  - [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/05_03_2024/[[]] Update from Laveen]
 
* '''[[Testing of PMT dividers]]''' -- Sasha / Vlad / George / Mindy
 
* '''[[Testing of PMT dividers]]''' -- Sasha / Vlad / George / Mindy
 
** - Testing procedure [https://halldweb.jlab.org/detectors/fcal2/dividers/divider_test_guide.pptx]
 
** - Testing procedure [https://halldweb.jlab.org/detectors/fcal2/dividers/divider_test_guide.pptx]

Revision as of 09:20, 3 May 2024

Media:Example.oggMeeting time and location:

  • 9:30 am EST (JLab time) remote only
  • Connection information
  • Preparation of parts for ECAL -- Sasha
    • - signal cables - done
    • - signal patch panel [1] - done
    • - HV short cables: received, checked, labeled (last week)
    • - HV long cable, 18 ready (out of 36)
    • - HV distribution boards: in preparation
    • - LV cables: waiting for about 160 cables (will need to test, label, and bundle)
    • - LV distribution boards [2]. Have to populate with connectors, and design a box around the PCB
    • - Chris S. is working on the prototype of the LED board. Currently 5 blue LEDs, consider to add red LEDs as well
  • Ongoing projects
    • - Bundling short cables (groups of 7, 7, and 6 cables): signal (done), HV (done), LV (36 layers done, waiting for cables) [3]
    • - [[] Update from Laveen]
  • Testing of PMT dividers -- Sasha / Vlad / George / Mindy
    • - Testing procedure [4]
    • - Mindy has finished with preparing all sockets (~1650) !
    • - All dividers have been fabricated and tested by George [5]
      • decided to remove regulators on about 40 dividers
    • - Adding ECAL and updating FCAL translation table in the TT.DB (have to finish during this week)
  • Installation of the FCAL2 detector & integration to GlueX -- Sasha / Vlad / Hakob / Laveen
    • Installation of the LMS has been completed [6]
    • Installation and testing cables and dividers [7][8]
    • All crates are connected to the network switch Ethernet switch [9]
    • Preparing for testing installed dividers
    • Detector installation page
    • Preparation for beam tests with the PS
      • measure shower beam profile
      • shower reconstruction between PbWO4 and LG
    • Other hardware projects
      • --prototype of the ECAL veto counter
      • --study shower profile using PS (also transition region between lead tungstate and LG modules (?) )
  • FCAL2 poster for open house?
    • JEF/ECAL/FCAL poster
  • Analysis/Simulation