Difference between revisions of "JEF meeting, October 7, 2022"

From GlueXWiki
Jump to: navigation, search
 
Line 22: Line 22:
 
* Preparation of parts for FCAL2 modules -- Sasha
 
* Preparation of parts for FCAL2 modules -- Sasha
 
* Light Monitoring System -- Arshak
 
* Light Monitoring System -- Arshak
 +
 +
=Minutes=
 +
Attendees: Phil, Arshak, Igal, Liping, Sasha, Zisis, Azizah, Jane, Tim B., S.T.
 +
* Phil will give a talk at the upcoming DNP meeting to highlight all the work done by the students during the summer
 +
* Received 40 lead tungstate crystals from physics division, out of 150
 +
* 60 more crystals to come
 +
* Wrapping continues, 45 to go of crystals in house
 +
* Fabricated module grand total = 1291
 +
** 100 more modules to be assembled by the end of the year
 +
** Have enough PMT housings for all available crystals, full set within 1-2 months
 +
** Light guides almost complete
 +
** Brass straps ordered, still waiting
 +
* Installation meetings: Sasha will present plans + manpower estimates
 +
** FCAL frame under construction
 +
** Cabling, patch panels, etc. under discussion
 +
** Have most electronics, need to order crate trigger processors
 +
*LMS: need to check FCAL plexiglas -- will it need to be replaced?

Latest revision as of 13:15, 11 October 2022

Meeting time and location:

  • 9:30 am EST (JLab time) remote only
  • Zoom meeting ID: 161 050 9142 Passcode: 004965

Agenda

Minutes

Attendees: Phil, Arshak, Igal, Liping, Sasha, Zisis, Azizah, Jane, Tim B., S.T.

  • Phil will give a talk at the upcoming DNP meeting to highlight all the work done by the students during the summer
  • Received 40 lead tungstate crystals from physics division, out of 150
  • 60 more crystals to come
  • Wrapping continues, 45 to go of crystals in house
  • Fabricated module grand total = 1291
    • 100 more modules to be assembled by the end of the year
    • Have enough PMT housings for all available crystals, full set within 1-2 months
    • Light guides almost complete
    • Brass straps ordered, still waiting
  • Installation meetings: Sasha will present plans + manpower estimates
    • FCAL frame under construction
    • Cabling, patch panels, etc. under discussion
    • Have most electronics, need to order crate trigger processors
  • LMS: need to check FCAL plexiglas -- will it need to be replaced?