Difference between revisions of "JEF meeting, September 16, 2022"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
Line 15: Line 15:
 
**[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/part_preparation.pdf Preparation of parts]
 
**[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/part_preparation.pdf Preparation of parts]
 
* Module fabrication  -- Sasha
 
* Module fabrication  -- Sasha
** Received 72 + 76 PMT housings from Tim
 
 
** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/fcal_fabrication.pdf  Status of fabrication ]
 
** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/fcal_fabrication.pdf  Status of fabrication ]
 
** Fabricated modules: <span style="color:#FF0000"> Total 1206  (a new milestone)</span>  
 
** Fabricated modules: <span style="color:#FF0000"> Total 1206  (a new milestone)</span>  

Revision as of 08:43, 16 September 2022

Meeting time and location:

  • 9:30 am EST (JLab time) remote only
  • Zoom meeting ID: 161 050 9142 Passcode: 004965

Agenda


  • Preparation of parts for FCAL2 modules -- Sasha
  • Module fabrication -- Sasha
  • Light Monitoring System -- Arshak