Difference between revisions of "JEF meeting, September 16, 2022"
From GlueXWiki
(→Agenda) |
(→Agenda) |
||
Line 16: | Line 16: | ||
* Module fabrication -- Sasha | * Module fabrication -- Sasha | ||
** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/fcal_fabrication.pdf Status of fabrication ] | ** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/fcal_fabrication.pdf Status of fabrication ] | ||
− | ** Fabricated modules: <span style="color:#FF0000"> Total 1221 | + | ** Fabricated modules: <span style="color:#FF0000"> Total 1221</span> |
*** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/module_fabrication.pdf All SICCAS 576 SICCAS] | *** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/module_fabrication.pdf All SICCAS 576 SICCAS] | ||
*** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/module_fabrication_crytur.pdf 630 CRYTUR], Remaining: 52 | *** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/module_fabrication_crytur.pdf 630 CRYTUR], Remaining: 52 |
Revision as of 09:25, 16 September 2022
Meeting time and location:
- 9:30 am EST (JLab time) remote only
- Zoom meeting ID: 161 050 9142 Passcode: 004965
Agenda
- Simulations/Analysis
- Preparation of parts for FCAL2 modules -- Sasha
- Crystals.
- 45 CRYTUR crystals received from Physics division
- currently available/ordered + CCAL: 1593 + (9) + 20 (recent order) = 1622 (may need to order more spares (?) )
- Wrapped CRYTUR crystals: 687
- - Available for wrapping: 722 - 687 = 35
- - DSG group continues wrapping
- Preparation of parts
- Crystals.
- Module fabrication -- Sasha
- Status of fabrication
- Fabricated modules: Total 1221
- All SICCAS 576 SICCAS
- 630 CRYTUR, Remaining: 52
- Updates from the FCAL installation meetings with Tim's group -- Sasha
- Light Monitoring System -- Arshak