Difference between revisions of "JEF meeting, September 16, 2022"

From GlueXWiki
Jump to: navigation, search
(Agenda)
Line 23: Line 23:
 
** [https://halldweb.jlab.org/wiki/index.php/FCAL_2_Design_Meetings Link to the earlier design meetings]
 
** [https://halldweb.jlab.org/wiki/index.php/FCAL_2_Design_Meetings Link to the earlier design meetings]
 
* Light Monitoring System -- Arshak
 
* Light Monitoring System -- Arshak
 +
 +
=Minutes=
 +
Attendees: Bill, Arshak, Axel, Sasha, Phil, Jane, Igal, Jon, Liping, S.T.
 +
* Received another 48 Crytur crystals (out of 150)
 +
* Expect 70 more from subsequent orders
 +
* Detector support group working on wrapping crystals
 +
* Only need about 200 light guides
 +
* Expect 100 PMTS this month
 +
* Received 75 PMT housings
 +
* Waiting for brass straps
 +
* Grand total fabricated modules = 1221, 77 more crystals ready for fabrication
 +
* Installation meetings will resume week of 9/19/22
 +
** Discussed patch panels for signal cables (with lemo connectors)
 +
* Week of 9/19/22:  Sasha to resume PMT divider bench tests
 +
** Dividers need to ordered in October

Revision as of 11:02, 19 September 2022

Meeting time and location:

  • 9:30 am EST (JLab time) remote only
  • Zoom meeting ID: 161 050 9142 Passcode: 004965

Agenda

Minutes

Attendees: Bill, Arshak, Axel, Sasha, Phil, Jane, Igal, Jon, Liping, S.T.

  • Received another 48 Crytur crystals (out of 150)
  • Expect 70 more from subsequent orders
  • Detector support group working on wrapping crystals
  • Only need about 200 light guides
  • Expect 100 PMTS this month
  • Received 75 PMT housings
  • Waiting for brass straps
  • Grand total fabricated modules = 1221, 77 more crystals ready for fabrication
  • Installation meetings will resume week of 9/19/22
    • Discussed patch panels for signal cables (with lemo connectors)
  • Week of 9/19/22: Sasha to resume PMT divider bench tests
    • Dividers need to ordered in October