Difference between revisions of "JLAB Engineering Design and Fab meeting"
From GlueXWiki
(→Hall D Solenoid Quench Path Forward in 2013) |
(→Hall D Engineering Group Meetings in 2013) |
||
Line 20: | Line 20: | ||
* [[May 24, 2013 Design Meeting]] | * [[May 24, 2013 Design Meeting]] | ||
* [[May 31, 2013 Fab Meeting]] | * [[May 31, 2013 Fab Meeting]] | ||
+ | * [[June 7, 2013 Design Meeting]] | ||
== Hall D Engineering Group Meetings in 2012 == | == Hall D Engineering Group Meetings in 2012 == |