Difference between revisions of "Jan 10, 2012 Readout"
From GlueXWiki
(→Minutes) |
|||
Line 37: | Line 37: | ||
= Minutes = | = Minutes = | ||
− | ''Attending: | + | ''Attending: Tim, Beni, John, Eugene, Yi (JLab); Javiera, Will, Alam, Hayk, Serguei (USM); Zisis, George (UofR); Christina, Pavlos, George (Athens). |
# Announcements | # Announcements | ||
# Review of Action Items | # Review of Action Items | ||
# Update from USM | # Update from USM | ||
− | # | + | ## [https://halldweb1.jlab.org/wiki/images/6/6a/HallDLightguideStatusJan10.pdf Light guides] |
− | #* [https://halldweb1.jlab.org/wiki/images/ | + | ##* update on light guide status |
− | # | + | ##* material obtained from suppliers to tanning beds, very high quality |
− | # | + | ##* drawings should be updated to reflect surfaces for all surfaces. |
+ | ##* Tim: asked for written procedures for polishing | ||
+ | ##* Optimizing tradeoff between machining and polishing steps. | ||
+ | ##* Expected schedule produces 80 first article units in three weeks. Partial delivery sooner. First article shipping in about one month. | ||
+ | ## [https://halldweb1.jlab.org/wiki/images/b/be/Hayk_presentation-Hall-D.pdf SiPM testing] | ||
+ | ## [https://halldweb1.jlab.org/wiki/images/a/af/Brief_about_station2.pdf Station 2 report] | ||
+ | ## [https://halldweb1.jlab.org/wiki/images/6/63/Production_manager_report_10_Jan_2012.pdf Production Manager Report] | ||
# Comments on [[Readiness Review: Testing of light sensors for Bcal]] | # Comments on [[Readiness Review: Testing of light sensors for Bcal]] | ||
# [http://atlasusr.fis.utfsm.cl:8000/ USM Web Interface to DB] | # [http://atlasusr.fis.utfsm.cl:8000/ USM Web Interface to DB] | ||
# Status of Testing at JLab | # Status of Testing at JLab | ||
# Other | # Other |
Revision as of 15:49, 10 January 2012
Teleconference Time: 11:00 a.m. EST
- ESNET (Number is 8542553) and EVO session (GlueX Calorimetry meeting room)
- Phone connection only upon request.
- +1-866-740-1260 : US and Canada
- +1-303-248-0285 : International
- then use participant code: 3421244# (the # is needed when using the phone)
- OR from www.readytalk.com type access code 3421244 into "join a meeting" without the # (you need java plugin)
Contents
Participant Direct Lines
- JLab Phone: in CC F326 is 757-269-6337 (usual room)
- JLab Phone in CC L207 is 757-269-7084
- Phone in the Regina Videoconference Suite is 306-585-4204
- Athens Phone: in Christina's office is 011-30-210-727-6947
Items for followup from previous meeting
- Yi and USM coordinate working on common interfaces to the data bases.
- USM questions
-
Cross talk between cells in PDE test (Will) -
How is the light source for the PDE measurements calibrated?
-
Documents to Review
Tentative Agenda
- Announcements
- Review of Action Items
- Update from USM
- Comments on Readiness Review: Testing of light sensors for Bcal
- USM Web Interface to DB
- Status of Testing at JLab
- Other
Minutes
Attending: Tim, Beni, John, Eugene, Yi (JLab); Javiera, Will, Alam, Hayk, Serguei (USM); Zisis, George (UofR); Christina, Pavlos, George (Athens).
- Announcements
- Review of Action Items
- Update from USM
- Light guides
- update on light guide status
- material obtained from suppliers to tanning beds, very high quality
- drawings should be updated to reflect surfaces for all surfaces.
- Tim: asked for written procedures for polishing
- Optimizing tradeoff between machining and polishing steps.
- Expected schedule produces 80 first article units in three weeks. Partial delivery sooner. First article shipping in about one month.
- SiPM testing
- Station 2 report
- Production Manager Report
- Light guides
- Comments on Readiness Review: Testing of light sensors for Bcal
- USM Web Interface to DB
- Status of Testing at JLab
- Other