Jan 10, 2012 Readout

From GlueXWiki
Revision as of 15:49, 10 January 2012 by Elton (Talk | contribs) (Minutes)

Jump to: navigation, search

Teleconference Time: 11:00 a.m. EST

  • ESNET (Number is 8542553) and EVO session (GlueX Calorimetry meeting room)
  • Phone connection only upon request.
    • +1-866-740-1260 : US and Canada
    • +1-303-248-0285 : International
    • then use participant code: 3421244# (the # is needed when using the phone)
    • OR from www.readytalk.com type access code 3421244 into "join a meeting" without the # (you need java plugin)

Participant Direct Lines

  • JLab Phone: in CC F326 is 757-269-6337 (usual room)
  • JLab Phone in CC L207 is 757-269-7084
  • Phone in the Regina Videoconference Suite is 306-585-4204
  • Athens Phone: in Christina's office is 011-30-210-727-6947

Items for followup from previous meeting

  1. Yi and USM coordinate working on common interfaces to the data bases.
  2. USM questions
    • Cross talk between cells in PDE test (Will)
    • How is the light source for the PDE measurements calibrated?

Documents to Review

Tentative Agenda

  1. Announcements
  2. Review of Action Items
  3. Update from USM
  4. Comments on Readiness Review: Testing of light sensors for Bcal
  5. USM Web Interface to DB
  6. Status of Testing at JLab
  7. Other

Minutes

Attending: Tim, Beni, John, Eugene, Yi (JLab); Javiera, Will, Alam, Hayk, Serguei (USM); Zisis, George (UofR); Christina, Pavlos, George (Athens).

  1. Announcements
  2. Review of Action Items
  3. Update from USM
    1. Light guides
      • update on light guide status
      • material obtained from suppliers to tanning beds, very high quality
      • drawings should be updated to reflect surfaces for all surfaces.
      • Tim: asked for written procedures for polishing
      • Optimizing tradeoff between machining and polishing steps.
      • Expected schedule produces 80 first article units in three weeks. Partial delivery sooner. First article shipping in about one month.
    2. SiPM testing
    3. Station 2 report
    4. Production Manager Report
  4. Comments on Readiness Review: Testing of light sensors for Bcal
  5. USM Web Interface to DB
  6. Status of Testing at JLab
  7. Other