June 15, 2016 Calibration

From GlueXWiki
Revision as of 12:48, 15 June 2016 by Sdobbs (Talk | contribs)

Jump to: navigation, search

GlueX Calibration Meeting
Wednesday, June 1, 2016
11:00 am, EST
JLab: CEBAF Center, F326

Communication Information

Remote Connection

You can connect using BlueJeans using the meeting number 630 804 895 .       (Click "Expand" to the right for more details -->):

  1. Make sure you have created a BlueJeans account via your JLab CUE account using this link:

  2. Meeting ID: 630804895
    • (you may need to type this in, depending how you connect)

  3. If connecting via Web Browser: click this link (no passcode is needed):

  4. If connecting via iOS or Android App:
    • Use your JLab e-mail address to log in and then enter the meeting ID given above to join the meeting

  5. If connecting via Phone: Dial one of the following numbers and then enter the meeting ID above and hit "#" or "##"

  6. If connecting via Polycom unit:
    • Dial 199.48.152.152 or bjn.vc
    • Enter meeting ID above
    • Use *4 to unmute

Slides

Talks can be deposited in the directory /group/halld/www/halldweb/html/talks/2016 on the JLab CUE. This directory is accessible from the web at https://halldweb.jlab.org/talks/2016/ .

Calibration Tasks

  1. Spring 2016 Recon Checklist
  2. Mcsmear updates - mcsmear 20160323
  3. Data Validation
  4. GlueX Detector Performance Document

Calibrations for Second Production Run

  • Fix handling of individually-read-out TAGM columns (Alex B.)
  • Updates to FCAL non-linearity (Adesh)
  • BCAL TDC calibrations (Andrei)
  • Realign detectors (~0.1ns shift) (Sean)

Agenda

  1. Announcements
  2. Calibration Updates
  3. Simulations
    • sim1.1 for data/simulation matching studies
      • Finishing preparations: update plugin list, wait for Adesh's FCAL updates
  4. AOB

Agenda

Attending: Sean (NU); Mike S., Will M., Naomi (CMU); Andrei (Regina); Matt S. (IU); Simon, Lubomir, Adesh, Beni, Alex B., Alex A., Mark I., Justin, Nathan, Eugene (JLab)

  1. Announcements came at the end of the meeting this time
  2. Calibration Updates
    • We reviewed the current status of calibrations for the next set of production runs (runs ). Mike is adding some better CDC calibrations today, and Nathan finished up this morning. Sean and Justin will check these and give their OK.
    • We then discussed the status of calibrations for the 3rd set of production runs (runs 10331 - 10913). These runs have been mostly calibrated, the issues left to do are:
      • Alex B. is double checking the TAGM calibrations for any lingering issues
      • Adesh is checking the non-linear corrections.
      • Nathan and Sean will discuss offline a plan for attacking the TAGH calibrations.
      • Naomi will work on the CDC gains. These are correlated with temperature and pressure in the CDC. These conditions varied over a larger range in these earlier runs, so she will need time to make sure her parameterization works for these runs.
      • We agreed on a deadline of next Friday for these calibrations, and to check the progress of these calibrations at the Analysis meeting next Tuesday.
    • Calibration Plans for Second Production Run
  3. Simulations
    • sim1.1 for data/simulation matching studies
      • Finishing preparations: update plugin list, wait for Adesh's FCAL updates
  4. AOB