Difference between revisions of "Mar 24, 2011 SiPM Electrical and Cooling"

From GlueXWiki
Jump to: navigation, search
(References)
Line 20: Line 20:
  
 
== Minutes ==
 
== Minutes ==
 +
''Attending: Jim, Elton, Jack, John, Yi, Carl, Eugene
 +
 +
# Announcements
 +
# Action Items
 +
# Schedule, reporting, and manpower (Elton)
 +
# [[Test Setup for SiPMs | First article testing]] (Carl and Yi)
 +
# Mechanical cooling (Jim)
 +
#* Review status of drawings for prototype (Chuck)
 +
# Temperature compensation (Jack)
 +
# Preamp-summing (Fernando)
 +
# Discussion

Revision as of 17:00, 24 March 2011

References

Action Items from previous meetings

Tentative Agenda

  1. Announcements
  2. Action Items
  3. Schedule, reporting, and manpower (Elton)
  4. First article testing (Carl and Yi)
  5. Mechanical cooling (Jim)
    • Review status of drawings for prototype (Chuck)
  6. Temperature compensation (Jack)
  7. Preamp-summing (Fernando)
  8. Discussion

Minutes

Attending: Jim, Elton, Jack, John, Yi, Carl, Eugene

  1. Announcements
  2. Action Items
  3. Schedule, reporting, and manpower (Elton)
  4. First article testing (Carl and Yi)
  5. Mechanical cooling (Jim)
    • Review status of drawings for prototype (Chuck)
  6. Temperature compensation (Jack)
  7. Preamp-summing (Fernando)
  8. Discussion