Difference between revisions of "Mar 31, 2011 SiPM Electrical and Cooling"

From GlueXWiki
Jump to: navigation, search
(Action Items from previous meetings)
(Action Items from previous meetings)
Line 6: Line 6:
  
 
# Responsibility for U-board in prototype. We all assume Fernando is taking care of this, but we need confirmation.
 
# Responsibility for U-board in prototype. We all assume Fernando is taking care of this, but we need confirmation.
 +
# Define cabling to controller boards: can they be ribbon cables?
 +
# Check impact of material at low end of readout, both in the tubes for cooling fluid but also in the Cu cooling plate. Need to check effect on particle trajectories.
  
 
== Tentative Agenda ==
 
== Tentative Agenda ==

Revision as of 17:13, 24 March 2011

References

Action Items from previous meetings

  1. Responsibility for U-board in prototype. We all assume Fernando is taking care of this, but we need confirmation.
  2. Define cabling to controller boards: can they be ribbon cables?
  3. Check impact of material at low end of readout, both in the tubes for cooling fluid but also in the Cu cooling plate. Need to check effect on particle trajectories.

Tentative Agenda

  1. Announcements
  2. Action Items
  3. Schedule, reporting, and manpower (Elton)
  4. First article testing (Carl and Yi)
  5. Mechanical cooling (Jim)
    • Review status of drawings for prototype (Chuck)
  6. Temperature compensation (Jack)
  7. Preamp-summing (Fernando)
  8. Discussion

Minutes

Attending: