Difference between revisions of "May 6, 2010 Readout"

From GlueXWiki
Jump to: navigation, search
(Items for followup from previous meeting)
(Tentative Agenda)
Line 23: Line 23:
 
# Review of Action Items
 
# Review of Action Items
 
# Update - USM  
 
# Update - USM  
 +
# USM MOU/contract update (Elton)
 
# Simulation runs  
 
# Simulation runs  
 
# Geometry
 
# Geometry

Revision as of 17:53, 5 May 2010

Teleconference Time: 11:00 a.m. EST

  • ESNET and EVO session
  • Phone in CC F326 is 757-269-6337
  • Phone:
    • +1-800-377-8846 : US
    • +1-888-276-7715 : Canada
    • +1-302-709-8424 : International
    • then enter participant code: 77438230# (remember the "#"). Phone connection only upon request.

Items for followup from previous meeting

  1. Serguei agreed to send out a testing proposal for comments, including preliminary circuit designs and list of available equipment at USM for reference.
  2. Fill out loan agreement for SiPM arrays at UofR (Elton).
  3. Start a bulleted list of testing for the SiPMs (Serguey).
  4. Distribution of p.e. corresponding to each sensor within the readout sum (Andrei).

Documents to Review

Tentative Agenda

  1. Announcements
  2. Review of Action Items
  3. Update - USM
  4. USM MOU/contract update (Elton)
  5. Simulation runs
  6. Geometry
  7. SiPM Radiation Hardness Test (Yi)
  8. SiPM - Testing Schedules
  9. Light guides

Minutes

Attending: