Difference between revisions of "May 6, 2010 Readout"

From GlueXWiki
Jump to: navigation, search
(Documents to Review)
(Documents to Review)
Line 19: Line 19:
  
 
* [[Image:SiPM contracting timeline v0.pdf]]
 
* [[Image:SiPM contracting timeline v0.pdf]]
 +
* [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=1474 GlueX-doc-1474] BCAL Dynamic Range from the Simulation with FLUKA
  
 
= Tentative Agenda =
 
= Tentative Agenda =

Revision as of 08:48, 6 May 2010

Teleconference Time: 11:00 a.m. EST

  • ESNET and EVO session
  • Phone in CC F326 is 757-269-6337
  • Phone:
    • +1-800-377-8846 : US
    • +1-888-276-7715 : Canada
    • +1-302-709-8424 : International
    • then enter participant code: 77438230# (remember the "#"). Phone connection only upon request.

Items for followup from previous meeting

  1. Serguei agreed to send out a testing proposal for comments, including preliminary circuit designs and list of available equipment at USM for reference.
  2. Fill out loan agreement for SiPM arrays at UofR (Elton).
  3. Start a bulleted list of testing for the SiPMs (Serguey).
  4. Distribution of p.e. corresponding to each sensor within the readout sum (Andrei).

Documents to Review

Tentative Agenda

  1. Announcements
  2. Review of Action Items
  3. Update - USM
  4. USM MOU/contract update (Elton)
  5. Simulation runs
  6. Geometry
  7. SiPM Radiation Hardness Test (Yi)
  8. SiPM - Testing Schedules
  9. Light guides

Minutes

Attending: