Difference between revisions of "May 7, 2020 CPP Design Meeting"

From GlueXWiki
Jump to: navigation, search
(Meeting Time and Place =)
(Minutes and Action Items)
 
(One intermediate revision by the same user not shown)
Line 13: Line 13:
 
* Alignment tolerances require fine adjustment [[Media:CPP_stand_iso.pdf]]
 
* Alignment tolerances require fine adjustment [[Media:CPP_stand_iso.pdf]]
 
* Things to work out
 
* Things to work out
** 90° connector
+
** 90° connector [[Media:Rory's_slides.pdf]]
 
** Gas line routing
 
** Gas line routing
 
** Procurement/installation schedule
 
** Procurement/installation schedule
Line 24: Line 24:
  
 
== Minutes and Action Items ==
 
== Minutes and Action Items ==
*Reviewed minutes of last meeting
+
* Reviewed minutes of last meeting
 
+
* Looked at possible installation schedules. The detector will be installed after spring 2021 run
 +
* Looked at gas line clearances - looks like bend radius is small enough so lines do not extend any further than the electronics panels on either side.
 +
* Need to design gas distribution manifold
 +
* Clearances cut in steel on 3D model look good
 +
* Need to review buckling loads on box tube (Tim)
 +
* Need to look at I-Beam reinforcement (Tim)
 
* Set up new meeting in 2 weeks
 
* Set up new meeting in 2 weeks

Latest revision as of 09:20, 21 May 2020

Meeting Time and Place =

Thursday May 7, 2020, 1:30pm Bluejeans https://bluejeans.com/735541157/3638?src=calendarLink

  • Present - Elton, Dave, Stephanie, Llya, Rory (remote)

Agenda

Minutes and Action Items

  • Reviewed minutes of last meeting
  • Looked at possible installation schedules. The detector will be installed after spring 2021 run
  • Looked at gas line clearances - looks like bend radius is small enough so lines do not extend any further than the electronics panels on either side.
  • Need to design gas distribution manifold
  • Clearances cut in steel on 3D model look good
  • Need to review buckling loads on box tube (Tim)
  • Need to look at I-Beam reinforcement (Tim)
  • Set up new meeting in 2 weeks