Difference between revisions of "Meetings"
From GlueXWiki
(→Engineering) |
(→Calorimetry) |
||
Line 37: | Line 37: | ||
* [[Calorimetry Archives]] | * [[Calorimetry Archives]] | ||
* [[BCAL Readout Segmentation]] | * [[BCAL Readout Segmentation]] | ||
+ | * [[BCAL Reconstruction]] | ||
===Electronics=== | ===Electronics=== |
Revision as of 12:05, 7 March 2013
Contents
Communication
|
GlueX General Meetings
GlueX Bi-Weekly Meetings |
GlueX-Collaboration-Meetings |
Collaboration Board |
GlueX Special Meetings
Working Group Meetings
Calorimetry
- Calorimetry Meetings
- BCAL Readout
- Calibration and Monitoring System Meetings
- SiPM electrical and cooling
- Calorimetry Archives
- BCAL Readout Segmentation
- BCAL Reconstruction
Electronics
Engineering
- GlueX/Hall-D Installation Meetings
- JLAB Engineering Design and Fab meeting
- BCAL Installation Schedule
Offline Software
Particle ID
- GlueX PID Biweekly Meetings
- GlueX Upgrade PID Meetings
- PID Progress
- May 2007 PID Workshop
- July 2007 PID Workshop
Photon Beam and Tagger
Physics
Start Counter
Target
Tracking
Trigger/DAQ/Monitoring/Controls
- Agendas and Minutes
- Subsystems Review
- GlueX Online Workshop July 2009 at CNU
- 12 GeV Trigger/Online Workshop July 2010 at CNU
- Agendas and Minutes for Controls meetings
GlueX Physics Meetings
- Photon-hadron physics with the GlueX detector at JLab (Program)