Difference between revisions of "Meetings"
From GlueXWiki
Line 2: | Line 2: | ||
* [[GlueX-Collaboration-Meetings]] | * [[GlueX-Collaboration-Meetings]] | ||
* [[Hall-D Weekly Meeting]] | * [[Hall-D Weekly Meeting]] | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
== Working Group Meetings == | == Working Group Meetings == | ||
Line 47: | Line 32: | ||
* Electronics | * Electronics | ||
** [[Electronics Workshops/Pre-meetings]] | ** [[Electronics Workshops/Pre-meetings]] | ||
+ | |||
+ | == GlueX Physics Meetings == | ||
+ | * Photon-hadron physics with the GlueX detector at JLab [[http://www.jlab.org/Hall-D/meetings/php2008/program.html | Program]] | ||
+ | |||
+ | == GlueX/HallD Reviews == | ||
+ | * Tracking Review (March 6-8, 2007) | ||
+ | ** [[http://www.jlab.org/Hall-D/reviews/Hall%20B%20&%20D%20Drift%20Chamber%20Review%20Mar07/ Review Site]] | ||
+ | * [[http://www.jlab.org/Hall-D/reviews/FDC_Mini_Review_Feb08 FDC Technology Review]] (February 1, 2008) | ||
+ | ** [[http://www.jlab.org/Hall-D/reviews/FDC_Mini_Review_Feb08/ Review SIte]] | ||
+ | * [[Calorimeter Review]] (February 19-20, 2008) | ||
+ | ** [[http://www.jlab.org/Hall-D/reviews/Calo_Review_Feb08 Review Site]] | ||
+ | * [[DC and PID Review | Drift Chamber and PID Review]] (March 27-28, 2008) | ||
+ | ** [[http://www.jlab.org/Hall-D/reviews/Tracking_PID_REVIEW_Mar08/ Review Site]] | ||
+ | * [[May 2008 Subsystem Review | Subsystems Review]] (May 7-9, 2008) | ||
+ | ** [[http://www.jlab.org/Hall-D/reviews/System_Review_May08/ Review Site]] |
Revision as of 11:45, 13 May 2008
Contents
GlueX General Meetings
Working Group Meetings
- Trigger/DAQ/Monitoring/Controls
- Particle ID
- Offline Software
- Photon Beam and Tagger
- Electronics
GlueX Physics Meetings
- Photon-hadron physics with the GlueX detector at JLab [| Program]
GlueX/HallD Reviews
- Tracking Review (March 6-8, 2007)
- [FDC Technology Review] (February 1, 2008)
- Calorimeter Review (February 19-20, 2008)
- Drift Chamber and PID Review (March 27-28, 2008)
- Subsystems Review (May 7-9, 2008)