Photon Beam Commissioning Discussion July 16, 2014

From GlueXWiki
Revision as of 16:12, 16 July 2014 by Elton (Talk | contribs) (Agenda)

Jump to: navigation, search

Organization

  • Time: 4 pm EST
  • Connecting: detailed instructions are here
  • Conference id: 536076821

References

Action Items

  • Send link to accelerator commissioning procedure (Mike)
  • Send Todd a geometry of tagger area, including the mapped tagger magnet field, for GEANT simulations (Richard)
  • Todd will provide the magnetic field of the quadrupole immediately upstream of the tagger magnet (Todd)
  • Check that radiator set for commissioning is available (Alexandre, Hovanes)
  • Check that RadCon detectors are available/installed in tagger hall and hall D (Alexandre)
  • Check that 'rapid access system' is being implemented in Hall D (Alexandre)
  • Organize preparations for review (Elton).

Agenda

  1. Announcements
  2. Electron Commissioning (Todd/Mike)
  3. Photon Commissioning Draft (Alexandre)
  4. Aug 8 Review: Location CC L102
    • Reviewers: Mike Spata, Brian Freeman, Stepan Stepanyan
    • Charge/Schedule
    • Materials: Accelerator Procedures (Mike); Plan for photon beam commissioning (Alexandre)
    • Talks: Overview/Goals/Charge (Eugene); Photon beam properties (Richard); Electron beam commissioning (Michael); Photon beam commissioning (Alexandre)
  5. Other business

Minutes

  • Attending: