<span style="color:red"> Oct 30th - Dec 24th 2014 meetings </span> | <span style="color:red"> Oct 30th - Dec 24th 2014 meetings </span> | ||
# Report relevant updates from 7:50 and 8:00 daily MCC meetings: | # Report relevant updates from 7:50 and 8:00 daily MCC meetings: | ||
− | #*Accelerator schedule: Accelerator | + | #*Accelerator schedule: No daily/weekly MCC meetings. Expected schedule: |
+ | ## Feb. 13 - Feb. 26: Beam restoration (13 days) | ||
+ | ## Feb. 27 - March 26: Accelerator development. Physics running conditions are similar to Fall 2014: <span style="color:red">Accelerator has priority.</span> Possible running for Halls A/B/D. | ||
+ | ## Apr. 3 - May 4: Physics run (Halls A/B/D). | ||
#* [https://cebaf.jlab.org/files/ops/accboard/ Link to accelerator short term schedule] | #* [https://cebaf.jlab.org/files/ops/accboard/ Link to accelerator short term schedule] | ||
# Report on Work in the Hall: | # Report on Work in the Hall: | ||
− | #*If you have work to do in the Hall, please | + | #*If you have work to do in the Hall, please notify Tom (Hall work coordinator) and if necessary, document it in the electronic logbook. |
#* The upstream platform is now a hearing protection area. Hall D is a radiation aread. OSL need to be worn everywhere in Hall D. | #* The upstream platform is now a hearing protection area. Hall D is a radiation aread. OSL need to be worn everywhere in Hall D. | ||
− | # | + | # [https://accweb.acc.jlab.org/hco/reports/overall-status?destinationId=9&systemId=®ionId=29&groupId= Hot Check OUT Status] <span style="color:green"> 13% ready </span>; <span style="color:#BABC3A">68% checked </span>; <span style="color:red">18% not ready </span> |
− | # [https://hdops.jlab.org/wiki/index.php/ | + | # [https://hdops.jlab.org/wiki/index.php/Spring_2015_Commissioning_Plan Spring 2015 runplan] |
# Commissioning readiness | # Commissioning readiness | ||
− | + | # Installation punch list (items in<span style="color:red"> red: must be done by ----- </span>; Blue: <span style="color:blue"> must be done by ----- </span>; <span style="color:green"> Green: Nice to have it</span> | |
− | + | #*<strike> <span style="color:red"> Reset HCO </span> </strike> | |
− | # Installation punch list (items in<span style="color:red"> red: must by | + | #* <span style="color:red"> LH2 Target</span> |
− | #*<strike> <span style="color:red"> | + | #** <span style="color:red"> Installation </span> |
− | # | + | #** <span style="color:red"> Controls </span> |
− | #** < | + | #*<span style="color:red"> Goniometer </span> |
− | #*< | + | #**<span style="color:red"> Build and install a frame at JLab for testing controls/tune procedure - </span> |
− | #* | + | #**<span style="color:red"> Procure a test diamond (Hall B? thick 300 μm diamond? for initial tests - </span> |
− | #** < | + | #**<span style="color:red"> Controls </span> |
− | #*< | + | #**<span style="color:red"> Establish the tune procedure (Ken L.) </span> |
− | #** < | + | #**<span style="color:blue"> Install nominal diamonds (sometimes in April)- </span> |
− | #*< | + | #*<span style="color:red">Active collimator (remains in its current position in front of 5mm hole and attached to primary collimator)</span> - |
− | #** < | + | #**<span style="color:red">Test installation in front of 3.4 mm hole</span> |
− | #*< | + | #**<span style="color:red">Check alignment</span> |
− | #* | + | #*<span style="color:red">Upstream profiler installed on an remotely controlled insertable holder</span> |
− | #* | + | #*<span style="color:green">downstream profiler</span> |
− | #*< | + | #**<span style="color:green">refurbished/remade</span> |
− | #** | + | #**<span style="color:green">Installed/tested/surveyed</span> |
− | #** | + | #*<span style="color:red">Survey</span> |
− | #** | + | #**<span style="color:red">Realign photon beam line after bellow installation</span> |
− | #** | + | #**<span style="color:red">P.S. detectors</span> |
− | # | + | #**<span style="color:red">TAC</span> |
− | #** | + | #**<span style="color:red">LH2/start counter</span> |
− | #** < | + | #**<span style="color:red">Diamond</span> |
− | #**< | + | #**<span style="color:red">Photon Polarimeter</span> |
− | #** < | + | #**<span style="color:red">Solenoid (in case of floor settling)</span> |
− | #*< | + | #**<span style="color:red">Upstream profiler</span> |
− | #*< | + | #*<span style="color:red">Solenoid</span> |
− | #*< | + | #**<span style="color:red">Power supply maintenance</span> |
− | #*< | + | #**<span style="color:red">Flow controler</span> |
− | #*< | + | #**<span style="color:red">Ground fault fuse monitoring</span> |
− | #*< | + | #*<span style="color:red">Start Counter</span> |
− | #* < | + | #**<span style="color:red"> Remove the piece of tape in the beam path. (Eric P.)</span> |
− | #* < | + | #**<span style="color:red"> Reinstall by end of January. Operational for cosmic runs </span> |
+ | #**<span style="color:red"> Check alignment (no tilt) </span> | ||
+ | #*<span style="color:red"> FDC </span> | ||
+ | #**<span style="color:red"> Chiller back by end of Feb. </span> | ||
+ | #**<span style="color:red"> Implement safety switch </span> | ||
+ | #*<span style="color:red"> CDC </span> | ||
+ | #**<span style="color:red"> Cable re-routing </span> | ||
+ | #**<span style="color:red"> Ready for Cosmic (BCal trigger) </span> | ||
+ | #*<span style="color:red"> Pair Spec. </span> | ||
+ | #**<span style="color:red"> Fix ≈10 chanels. </span> | ||
+ | #**<span style="color:red"> Have a user-friendly gui </span> | ||
+ | #*<span style="color:red"> FCal </span> | ||
+ | #**<span style="color:red"> Improve GUI </span> | ||
+ | #*<span style="color:red"> TOF </span> | ||
+ | #**<span style="color:red"> Voltage Range </span> | ||
+ | #*<span style="color:red">Shielding</span> | ||
+ | #**<span style="color:red">Tagger</span> | ||
+ | #***<span style="color:red">Improve shielding at entrance of tagger magnet</span> | ||
+ | #***<span style="color:red">shield e- beam flange</span> | ||
+ | #***<span style="color:red">Shield near tagger rack</span> | ||
+ | #** <span style="color:red">Collimator cave: shield gamma probe</span> | ||
+ | #*<span style="color:red">Radiation monitor</span> | ||
+ | #**<span style="color:green">Installed new radiation monitors</span> | ||
+ | #**<span style="color:red">Lay cables for new neutron probe downstream of Solenoid</span> | ||
+ | #*<span style="color:red">Trigger</span> | ||
+ | #**<span style="color:red">Trigger connection to TDC (Beni)</span> | ||
+ | #**<span style="color:red">Firmware update</span> | ||
+ | #**<span style="color:red">Change jumper in distribution board (Alex S.)?</span> | ||
+ | #**<span style="color:green">Fix F125 firmware problem</span> | ||
+ | #*<span style="color:red">DAQ: Multiblock mode run at ≈20 kHz</span> | ||
+ | #*<span style="color:red">Online</span> | ||
+ | #**<span style="color:red">Fix high rate freeze</span> | ||
+ | #**<span style="color:red">Upgrade O.S. (Red Hat 7) ?</span> | ||
+ | #**<span style="color:red">Improve software for scaler readout (Mark D.)</span> | ||
+ | #*<span style="color:red">Accelerator RF timing (Elton/Fernando)</span> | ||
+ | #*<span style="color:red">Photon polarimeter</span> | ||
+ | #**<span style="color:green>Installation</span> | ||
+ | #**<span style="color:green">Control</span> | ||
+ | #*<span style="color:green>TAC</span> | ||
+ | #*<span style="color:blue">Phone Spring repeater. Run w/ and w/o it</span> | ||
# Specific safety notice (from Tom/Tim/Mark): | # Specific safety notice (from Tom/Tim/Mark): | ||
− | |||
== Commissioning of Each Detector == | == Commissioning of Each Detector == |
Revision as of 09:23, 15 January 2015
Contents
General information
Weekly Meetings, 8:45am, Hall D conference room. Held by the Run Coordinator. Present Run Coordinator: Alexandre Deur
Connect Information
To connect from the outside by phone please do the following
1.) To join via a Web Browser, go to the page [1] https://bluejeans.com/660743227.
2.) To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 660743227.
3.) To join via phone, use one of the following numbers and the Conference ID: 660743227.
4.) The moderator code is 8394
Dial Either +1 408 740 7256 or +1 888 240 2560 for US or Canada
4.) More information on connecting to bluejeans is available. The old ESNET and SeeVough Information is archived here.
Specific instructions for connecting from JLab's Hall D conference room:
- Turn polycon on if necessary (do it before turning the computer on)
- With the polycon, place a call at 199.48.152.152
- Press # to enable the polycom keypad, then enter the meeting id: 660743227 and #
- You may have to unmute the microphone: #*4
- Turn the computer on if needed
Meeting General Agenda
Oct 30th - Dec 24th 2014 meetings
- Report relevant updates from 7:50 and 8:00 daily MCC meetings:
- Accelerator schedule: No daily/weekly MCC meetings. Expected schedule:
- Feb. 13 - Feb. 26: Beam restoration (13 days)
- Feb. 27 - March 26: Accelerator development. Physics running conditions are similar to Fall 2014: Accelerator has priority. Possible running for Halls A/B/D.
- Apr. 3 - May 4: Physics run (Halls A/B/D).
- Report on Work in the Hall:
- If you have work to do in the Hall, please notify Tom (Hall work coordinator) and if necessary, document it in the electronic logbook.
- The upstream platform is now a hearing protection area. Hall D is a radiation aread. OSL need to be worn everywhere in Hall D.
- Hot Check OUT Status 13% ready ; 68% checked ; 18% not ready
- Spring 2015 runplan
- Commissioning readiness
- Installation punch list (items in red: must be done by ----- ; Blue: must be done by ----- ; Green: Nice to have it
Reset HCO- LH2 Target
- Installation
- Controls
- Goniometer
- Build and install a frame at JLab for testing controls/tune procedure -
- Procure a test diamond (Hall B? thick 300 μm diamond? for initial tests -
- Controls
- Establish the tune procedure (Ken L.)
- Install nominal diamonds (sometimes in April)-
- Active collimator (remains in its current position in front of 5mm hole and attached to primary collimator) -
- Test installation in front of 3.4 mm hole
- Check alignment
- Upstream profiler installed on an remotely controlled insertable holder
- downstream profiler
- refurbished/remade
- Installed/tested/surveyed
- Survey
- Realign photon beam line after bellow installation
- P.S. detectors
- TAC
- LH2/start counter
- Diamond
- Photon Polarimeter
- Solenoid (in case of floor settling)
- Upstream profiler
- Solenoid
- Power supply maintenance
- Flow controler
- Ground fault fuse monitoring
- Start Counter
- Remove the piece of tape in the beam path. (Eric P.)
- Reinstall by end of January. Operational for cosmic runs
- Check alignment (no tilt)
- FDC
- Chiller back by end of Feb.
- Implement safety switch
- CDC
- Cable re-routing
- Ready for Cosmic (BCal trigger)
- Pair Spec.
- Fix ≈10 chanels.
- Have a user-friendly gui
- FCal
- Improve GUI
- TOF
- Voltage Range
- Shielding
- Tagger
- Improve shielding at entrance of tagger magnet
- shield e- beam flange
- Shield near tagger rack
- Collimator cave: shield gamma probe
- Tagger
- Radiation monitor
- Installed new radiation monitors
- Lay cables for new neutron probe downstream of Solenoid
- Trigger
- Trigger connection to TDC (Beni)
- Firmware update
- Change jumper in distribution board (Alex S.)?
- Fix F125 firmware problem
- DAQ: Multiblock mode run at ≈20 kHz
- Online
- Fix high rate freeze
- Upgrade O.S. (Red Hat 7) ?
- Improve software for scaler readout (Mark D.)
- Accelerator RF timing (Elton/Fernando)
- Photon polarimeter
- Installation
- Control
- TAC
- Phone Spring repeater. Run w/ and w/o it
- Specific safety notice (from Tom/Tim/Mark):
Commissioning of Each Detector
- FADC vs. CAEN TDC timing, November 21, 2014
- Overview of Offline Monitoring Nov 20 2014
- Start Counter ST performance during Run 995
- CDC CDC Update
- FDC
- FCAL FCAL Update
- BCAL BCAL status from HDLOG
- TOF Status: TOF performance in Run 995
- Active collimator status: Initial calibration from y beam scan
- Offline Monitoring: Run Browser, Plot Browser, and Time Series webpages
Detector Daily Report
- 12/03/14: BCal report (Elton and Mark Dalton) 1st part: Pedestal and timing plots from BCal. 2nd part: higher level plots from BCal.
- 12/04/14: ST report (Eric Pooser) ST Performance Update
- 12/05/14: FDC report (Lubomir) FDC performance in fall run, Gain calibration
- 12/08/14: TagM: report (Richard Jones) Status Report on TAGM Commissioning
- 12/09/14: TagH: report (Nathan Sparks) Status Report on TAGH Commissioning
- 12/10/14: TagM: report (Richard Jones) Status Report on TAGM Commissioning, part 2
- 12/11/14: FCAL: report (Matt Shepherd) Pedestal Status Report
- 12/12/14: CDC: report (Mike) CDC Status Update
- 12/15/14: TOF report ( Alex. Ostrovidov) TOF low level signals
- 12/17/14: DAQ report (Sergei Furletov) DAQ report
- 12/18/14: Pair Spectrometer report (Alex. Somov)
- 12/19/14: