==  Thursday, February 27 ==  
 
==  Thursday, February 27 ==  

Revision as of 09:36, 28 February 2020

<- Back to Run Coordination Meetings:Fall2019 Run Integrated trigger count

Thursday, February 27

  1. Last 24 hours
    • Harpscan done at 12:43pm. [1]
    • Good production afternoon-7 pm
    • tripy beam 7:00pm - 9:30pm: beam tripping off tagger BLM. Asked to shift 5C11B x position from -0.5 to -0.75.[2]
    • No beam 11:00 pm - 7:00 am
  2. Reports/Issues
  3. Run Plan
    • No beam 8am-10am , Hall B beam restoration software reset.
    • Production
    • Starting with a special HARP scan requested by Hovanes: hall A on at 150nA, 350nA for us, use Tagger_Electron_Left_Halo for analyzing.

Friday, February 28

  1. Last 24 hours
    • Harp and Collimator scan (before :11:30am). Convergence Collimator scan
    • Request to change collomator position by Hovanes at 4:30pm [5]
    • Production till 11pm with 350nA, then 250nA
    • No beam overnight
  2. Reports/Issues
  3. Run Plan
    • No beam 8am-10am , Hall B beam restoration software reset.
    • Production