Difference between revisions of "Run Planning Meeting Notes, Feb 27-Mar 05, 2020"

From GlueXWiki
Jump to: navigation, search
(Monday, March 3)
(Monday, March 3)
Line 62: Line 62:
 
# Reports/Issues
 
# Reports/Issues
 
#* Monitoring issue is [https://logbooks.jlab.org/entry/3796487 not yet fixed], waiting on Sean's new calibration. Then timestamp change on RCDB.
 
#* Monitoring issue is [https://logbooks.jlab.org/entry/3796487 not yet fixed], waiting on Sean's new calibration. Then timestamp change on RCDB.
 +
#* Gluon05 is operating on single monitor. Require Sergey's attention.
 
# Run Plan
 
# Run Plan
 
#* Hall work with Radcon support  
 
#* Hall work with Radcon support  

Revision as of 09:26, 3 March 2020

<- Back to Run Coordination Meetings:Fall2019 Run Integrated trigger count

Thursday, February 27

  1. Last 24 hours
    • Harpscan done at 12:43pm. [1]
    • Good production afternoon-7 pm
    • tripy beam 7:00pm - 9:30pm: beam tripping off tagger BLM. Asked to shift 5C11B x position from -0.5 to -0.75.[2]
    • No beam 11:00 pm - 7:00 am
  2. Reports/Issues
  3. Run Plan
    • No beam 8am-10am , Hall B beam restoration software reset.
    • Production
    • Starting with a special HARP scan requested by Hovanes: hall A on at 150nA, 350nA for us, use Tagger_Electron_Left_Halo for analyzing.

Friday, February 28

  1. Last 24 hours
  2. Beam stability
    • Harp and Collimator scan (before :11:30am). Convergence Collimator scan
    • Request to change collomator position by Hovanes at 4:30pm [5]
    • Production till 11pm with 350nA, then 250nA
    • No beam overnight
  3. Reports/Issues
  4. Run Plan
    • No beam 8am-10am , Hall B beam restoration software reset.
    • Production


Monday, March 2

  1. Weekend running
  2. Reports/Issues
  3. Run Plan
    • Production
    • Harp scan
    • Beam study tomorrow 9-5pm.

Monday, March 3

  1. Last 24 hours
    • Beam: 3 hours in day shift; 2 hours in swing shift; 2.5 hours in owl shift.
  2. Reports/Issues
    • Monitoring issue is not yet fixed, waiting on Sean's new calibration. Then timestamp change on RCDB.
    • Gluon05 is operating on single monitor. Require Sergey's attention.
  3. Run Plan
    • Hall work with Radcon support
      • Collimator cave (Keith), observation and verification only.
      • Collecting DIRC water sample (Keith).
    • Beam study tomorrow 9-4pm. Beam restoration at 3pm.
    • Starting with a Harp scan