==  Wednesday, February 26 ==  
+
<- Back to [[Run Coordination Meetings:Fall2019 Run]]
 +
[https://halldweb.jlab.org/data_monitoring/run_statistics/RunPeriod-2019-11/index.html Integrated trigger count]
 +
 
 +
==  Thursday, February 27 ==  
 
# Last 24 hours
 
# Last 24 hours
 +
#* Harpscan done at 12:43pm. [https://logbooks.jlab.org/entry/3793092]
 
#* Good production afternoon-7 pm
 
#* Good production afternoon-7 pm
#* tripy beam 7:00pm - 9:30pm: beam tripping off tagger BLM.  
+
#* tripy beam 7:00pm - 9:30pm: beam tripping off tagger BLM. Asked to shift 5C11B x position from -0.5 to -0.75.[https://logbooks.jlab.org/entry/3792662]
 
#* No beam 11:00 pm - 7:00 am
 
#* No beam 11:00 pm - 7:00 am
 
# Reports/Issues
 
# Reports/Issues
 
#*[https://logbooks.jlab.org/entry/3792575 Gluon05 monitors]
 
#*[https://logbooks.jlab.org/entry/3792575 Gluon05 monitors]
 
#*[https://logbooks.jlab.org/entry/3793022 DIRC root_spy monitoring plot]
 
#*[https://logbooks.jlab.org/entry/3793022 DIRC root_spy monitoring plot]
#* DIRC LV regulation issue: [https://logbooks.jlab.org/entry/3792445]
+
#* DIRC LV regulation issue: [https://logbooks.jlab.org/entry/3792445] [https://logbooks.jlab.org/entry/3792450]
 +
#** Conclusion: adding LV regulation to the DIRC todo list.
 +
#* [https://logbooks.jlab.org/entry/3793084 Transmission issue]
 
# Run Plan
 
# Run Plan
 +
#* No beam 8am-10am , Hall B beam restoration software reset.
 
#* Production
 
#* Production
 +
#* Starting with a special HARP scan requested by Hovanes: hall A on at 150nA, 350nA for us, use Tagger_Electron_Left_Halo for analyzing.
 +
 +
==  Friday, February 28 ==
 +
# Last 24 hours
 +
# [https://logbooks.jlab.org/entry/3793774 Beam stability]
 +
#* Harp and Collimator scan (before :11:30am). [https://logbooks.jlab.org/entry/3793131 Convergence] [https://logbooks.jlab.org/entry/3793147 Collimator scan]
 +
#* Request to change collomator position by Hovanes at 4:30pm [https://logbooks.jlab.org/entry/3793371]
 +
#* Production till 11pm with 350nA, then 250nA
 +
#* No beam overnight
 +
# Reports/Issues
 +
#* [https://logbooks.jlab.org/entry/3793724 Rate and ratios]
 +
#* root_spy crashes when started on Gluon03: [https://logbooks.jlab.org/entry/3793251] [https://logbooks.jlab.org/entry/3793712]
 +
#* DIRC temperature/communication error [https://logbooks.jlab.org/entry/3793238]
 +
#* Monitoring issue: [https://logbooks.jlab.org/entry/3793304 Low phi,rho,omega yields] [https://logbooks.jlab.org/entry/3793325 FCAL timing difference for run 71933 and 71934]
 +
# Run Plan
 
#* No beam 8am-10am , Hall B beam restoration software reset.
 
#* No beam 8am-10am , Hall B beam restoration software reset.
 +
#* Production
 +
 +
 +
==  Monday, March 2 ==
 +
# Weekend running
 +
#* [https://cebaf.jlab.org/ last owl]
 +
#* Smooth running. [https://halldweb.jlab.org/data_monitoring/run_statistics/RunPeriod-2019-11/index.html 5B triggers per day]. Beam trip reduction: 21 trips/hour Friday swing - 10 trips/hour owl Monday.
 +
#* AD00 study successful ([https://logbooks.jlab.org/entry/3795023 contributing to 45/51 trips])
 +
#** Report: https://logbooks.jlab.org/entry/3795114
 +
#** Hall A bleed-through was hitting a flange
 +
# Reports/Issues
 +
#* Hole in the FCal occupancy Sunday Owl: https://logbooks.jlab.org/entry/3795081.
 +
#** Board replaced: https://logbooks.jlab.org/entry/3795190
 +
#* root_spy crashes on gluon machines and DIRC plots aren't there.
 +
#* Monitoring issue resolved after RCDB timestamp change.
 +
#** New sets of reference plots needed for high luminosity
 +
#* gluonraid4 filled: https://logbooks.jlab.org/entry/3795382
 +
#* Collimator scan: https://logbooks.jlab.org/entry/3793951
 +
#* [https://halldweb.jlab.org/work/halld2/data_monitoring/RunPeriod-2019-11/mon_ver01/Run072036/BEAM_overview.png New beam accidental scaling plot] (Beni)
 +
# Run Plan
 +
#* Production
 +
#* Harp scan
 +
#* Beam study tomorrow 9-5pm.
 +
 +
==  Tuesday, March 3 ==
 +
# Last 24 hours
 +
#* Beam: 3 hours in day shift; 2 hours in swing shift; 2.5 hours in owl shift.
 +
#* Personel change and support.
 +
# Reports/Issues
 +
#* Monitoring issue is [https://logbooks.jlab.org/entry/3796487 not yet fixed], waiting on Sean's new calibration. Then timestamp change on RCDB.
 +
#* Gluon05 is operating on single monitor. Require Sergey's attention.
 +
#* DIRC occupancy plot discrepancy: [https://logbooks.jlab.org/entry/3796262]
 +
#* Rate and transmission monitoring [https://logbooks.jlab.org/entry/3796430]
 +
#* DIRC LED trigger stability Monitoring [https://logbooks.jlab.org/entry/3795889]
 +
# Run Plan
 +
#* Hall work with Radcon support
 +
#** Collimator cave (Keith), observation and verification only.
 +
#** Collecting DIRC water sample (Keith).
 +
#* Beam study tomorrow 9-4pm. Beam restoration at 3pm.
 +
#* Starting with a Harp scan
 +
 +
 +
==  Wednesday, March 4 ==
 +
# Last 24 hours
 +
#* 10 hours of beam in total: 2.5 hours with Cris in swing; 7 hours with Tolga in owl.
 +
#* Beam Convergence[https://logbooks.jlab.org/entry/3796837].
 +
#* Hall work completed: FCal bases replaced and DIRC water collected.
 +
# Reports/Issues
 +
#* Monitoring issue is [https://logbooks.jlab.org/entry/3797149 not yet fixed], waiting on Sean's new calibration. Then timestamp change on RCDB. Sean called for volunteer for monitoring.
 +
#* Gluon05 is operating on 0-1 monitor. Require Sergey's attention.
 +
#* Tagger field drift on Sunday: [https://logbooks.jlab.org/entry/3796676 current] [https://logbooks.jlab.org/entry/3796710 tagger field]
 +
#* BCal LED pulser restarted: [https://logbooks.jlab.org/entry/3797164]
 +
#* DIRC per pi+ track: [https://logbooks.jlab.org/entry/3797110]
 +
#* Hall Camera? What is the best way to get to it? [https://logbooks.jlab.org/entry/3796470 Gluon03 cant get to the cameras].
 +
# Run Plan
 +
#* Beam off: 8:30-13:30. Hall A & B beam restoration software and hall A&C laser tail investigation
 +
#* Production

Latest revision as of 10:14, 4 March 2020

<- Back to Run Coordination Meetings:Fall2019 Run Integrated trigger count

Thursday, February 27

  1. Last 24 hours
    • Harpscan done at 12:43pm. [1]
    • Good production afternoon-7 pm
    • tripy beam 7:00pm - 9:30pm: beam tripping off tagger BLM. Asked to shift 5C11B x position from -0.5 to -0.75.[2]
    • No beam 11:00 pm - 7:00 am
  2. Reports/Issues
  3. Run Plan
    • No beam 8am-10am , Hall B beam restoration software reset.
    • Production
    • Starting with a special HARP scan requested by Hovanes: hall A on at 150nA, 350nA for us, use Tagger_Electron_Left_Halo for analyzing.

Friday, February 28

  1. Last 24 hours
  2. Beam stability
    • Harp and Collimator scan (before :11:30am). Convergence Collimator scan
    • Request to change collomator position by Hovanes at 4:30pm [5]
    • Production till 11pm with 350nA, then 250nA
    • No beam overnight
  3. Reports/Issues
  4. Run Plan
    • No beam 8am-10am , Hall B beam restoration software reset.
    • Production


Monday, March 2

  1. Weekend running
  2. Reports/Issues
  3. Run Plan
    • Production
    • Harp scan
    • Beam study tomorrow 9-5pm.

Tuesday, March 3

  1. Last 24 hours
    • Beam: 3 hours in day shift; 2 hours in swing shift; 2.5 hours in owl shift.
    • Personel change and support.
  2. Reports/Issues
    • Monitoring issue is not yet fixed, waiting on Sean's new calibration. Then timestamp change on RCDB.
    • Gluon05 is operating on single monitor. Require Sergey's attention.
    • DIRC occupancy plot discrepancy: [9]
    • Rate and transmission monitoring [10]
    • DIRC LED trigger stability Monitoring [11]
  3. Run Plan
    • Hall work with Radcon support
      • Collimator cave (Keith), observation and verification only.
      • Collecting DIRC water sample (Keith).
    • Beam study tomorrow 9-4pm. Beam restoration at 3pm.
    • Starting with a Harp scan


Wednesday, March 4

  1. Last 24 hours
    • 10 hours of beam in total: 2.5 hours with Cris in swing; 7 hours with Tolga in owl.
    • Beam Convergence[12].
    • Hall work completed: FCal bases replaced and DIRC water collected.
  2. Reports/Issues
    • Monitoring issue is not yet fixed, waiting on Sean's new calibration. Then timestamp change on RCDB. Sean called for volunteer for monitoring.
    • Gluon05 is operating on 0-1 monitor. Require Sergey's attention.
    • Tagger field drift on Sunday: current tagger field
    • BCal LED pulser restarted: [13]
    • DIRC per pi+ track: [14]
    • Hall Camera? What is the best way to get to it? Gluon03 cant get to the cameras.
  3. Run Plan
    • Beam off: 8:30-13:30. Hall A & B beam restoration software and hall A&C laser tail investigation
    • Production