Difference between revisions of "Run Planning Meeting Notes, Feb 27-Mar 05, 2020"

From GlueXWiki
Jump to: navigation, search
(Monday, March 2)
(Monday, March 2)
Line 50: Line 50:
 
#** gluonraid4 filled: https://logbooks.jlab.org/entry/3795382
 
#** gluonraid4 filled: https://logbooks.jlab.org/entry/3795382
 
#** Collimator scan: https://logbooks.jlab.org/entry/3793951
 
#** Collimator scan: https://logbooks.jlab.org/entry/3793951
 +
#* [https://halldweb.jlab.org/work/halld2/data_monitoring/RunPeriod-2019-11/mon_ver01/Run072036/BEAM_overview.png New beam accidental scaling plot] (Beni)
 
# Run Plan
 
# Run Plan
 
#* Production
 
#* Production
 
#* Harp scan
 
#* Harp scan
 
#* Beam study tomorrow 9-5pm.
 
#* Beam study tomorrow 9-5pm.

Revision as of 09:41, 2 March 2020

<- Back to Run Coordination Meetings:Fall2019 Run Integrated trigger count

Thursday, February 27

  1. Last 24 hours
    • Harpscan done at 12:43pm. [1]
    • Good production afternoon-7 pm
    • tripy beam 7:00pm - 9:30pm: beam tripping off tagger BLM. Asked to shift 5C11B x position from -0.5 to -0.75.[2]
    • No beam 11:00 pm - 7:00 am
  2. Reports/Issues
  3. Run Plan
    • No beam 8am-10am , Hall B beam restoration software reset.
    • Production
    • Starting with a special HARP scan requested by Hovanes: hall A on at 150nA, 350nA for us, use Tagger_Electron_Left_Halo for analyzing.

Friday, February 28

  1. Last 24 hours
  2. Beam stability
    • Harp and Collimator scan (before :11:30am). Convergence Collimator scan
    • Request to change collomator position by Hovanes at 4:30pm [5]
    • Production till 11pm with 350nA, then 250nA
    • No beam overnight
  3. Reports/Issues
  4. Run Plan
    • No beam 8am-10am , Hall B beam restoration software reset.
    • Production


Monday, March 2

  1. Last 24 hours
  2. Reports/Issues
  3. Run Plan
    • Production
    • Harp scan
    • Beam study tomorrow 9-5pm.