Thursday, February 27

  1. Last 24 hours
    • Harpscan done at 12:43pm. [1]
    • Good production afternoon-7 pm
    • tripy beam 7:00pm - 9:30pm: beam tripping off tagger BLM. Asked to shift 5C11B x position from -0.5 to -0.75.[2]
    • No beam 11:00 pm - 7:00 am
  2. Reports/Issues
  3. Run Plan
    • No beam 8am-10am , Hall B beam restoration software reset.
    • Production
    • Starting with a special HARP scan requested by Hovanes: hall A on at 150nA, 350nA for us, use Tagger_Electron_Left_Halo for analyzing.

Friday, February 28

  1. Last 24 hours
  2. Beam stability
    • Harp and Collimator scan (before :11:30am). Convergence Collimator scan
    • Request to change collomator position by Hovanes at 4:30pm [5]
    • Production till 11pm with 350nA, then 250nA
    • No beam overnight
  3. Reports/Issues
  4. Run Plan
    • No beam 8am-10am , Hall B beam restoration software reset.
    • Production


Monday, March 2

  1. Weekend running
  2. Reports/Issues
  3. Run Plan
    • Production
    • Harp scan
    • Beam study tomorrow 9-5pm.

Tuesday, March 3

  1. Last 24 hours
    • Beam: 3 hours in day shift; 2 hours in swing shift; 2.5 hours in owl shift.
    • Personel change and support.
  2. Reports/Issues
    • Monitoring issue is not yet fixed, waiting on Sean's new calibration. Then timestamp change on RCDB.
    • Gluon05 is operating on single monitor. Require Sergey's attention.
    • DIRC occupancy plot discrepancy: [9]
    • Rate and transmission monitoring [10]
    • DIRC LED trigger stability Monitoring [11]
  3. Run Plan
    • Hall work with Radcon support
      • Collimator cave (Keith), observation and verification only.
      • Collecting DIRC water sample (Keith).
    • Beam study tomorrow 9-4pm. Beam restoration at 3pm.
    • Starting with a Harp scan


Wednesday, March 4

  1. Last 24 hours
    • 10 hours of beam in total: 2.5 hours with Cris in swing; 7 hours with Tolga in owl.
    • Beam Convergence[12].
    • Hall work completed: FCal bases replaced and DIRC water collected.
  2. Reports/Issues
    • Monitoring issue is not yet fixed, waiting on Sean's new calibration. Then timestamp change on RCDB. Sean called for volunteer for monitoring.
    • Gluon05 is operating on 0-1 monitor. Require Sergey's attention.
    • Tagger field drift on Sunday: current tagger field
    • BCal LED pulser restarted: [13]
    • DIRC per pi+ track: [14]
    • Hall Camera? What is the best way to get to it? Gluon03 cant get to the cameras.
  3. Run Plan
    • Beam off: 8:30-13:30. Hall A & B beam restoration software and hall A&C laser tail investigation
    • Production