Difference between revisions of "Run Planning Meeting Notes, September 8 - September 14, 2022"

From GlueXWiki
Jump to: navigation, search
(Created page with "Meetings are via ZoomGov: [https://jlab-org.zoomgov.com/j/1601990060?pwd=TUtwTGszMFg5bjhwdC9nU0IvREUzZz09 connect] (Meeting ID: 160 199 0060 / Passcode 8394) [https://cebaf.j...")
 
m (Past 24 hours)
Line 11: Line 11:
 
= Thursday, September 8 =
 
= Thursday, September 8 =
 
=== Past 24 hours ===
 
=== Past 24 hours ===
* Maintenance day
+
* [https://logbooks.jlab.org/entry/4039104 Maintenance day]
 
* Work done in hall:
 
* Work done in hall:
**Removed Be target:  
+
**[https://logbooks.jlab.org/entry/4038926 Removed Be target], [https://logbooks.jlab.org/entry/4038959 Installed He target and ramped magnet]:  
**Installed He target:  
+
**[https://logbooks.jlab.org/entry/4038961 Fixed connection for missing channels in ST]:
**Fixed missing channels in ST:
+
 
**Replaced FCAL bases & one PMT: [https://logbooks.jlab.org/entry/4038778], [https://logbooks.jlab.org/entry/4038847]
 
**Replaced FCAL bases & one PMT: [https://logbooks.jlab.org/entry/4038778], [https://logbooks.jlab.org/entry/4038847]
 
*LHe Target full and ready after ~11 hours, [https://logbooks.jlab.org/entry/4038896]
 
*LHe Target full and ready after ~11 hours, [https://logbooks.jlab.org/entry/4038896]

Revision as of 07:54, 8 September 2022

Meetings are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)

MCC whiteboard

Hall D counting room white board

Hall D Logbook

Back to Run Coordination Meetings:Fall2022

Thursday, September 8

Past 24 hours

Issues

Plan

  • Rate+Trigger Studies (Sasha)
  • Begin(continue) production on LHe Target @200nA