Difference between revisions of "Run Planning Meeting Notes, September 8 - September 14, 2022"

From GlueXWiki
Jump to: navigation, search
m
m (Thursday, September 8)
Line 17: Line 17:
 
**Replaced FCAL bases & one PMT: [https://logbooks.jlab.org/entry/4038778], [https://logbooks.jlab.org/entry/4038847]
 
**Replaced FCAL bases & one PMT: [https://logbooks.jlab.org/entry/4038778], [https://logbooks.jlab.org/entry/4038847]
 
*LHe Target full and ready after ~11 hours, [https://logbooks.jlab.org/entry/4038896]
 
*LHe Target full and ready after ~11 hours, [https://logbooks.jlab.org/entry/4038896]
 +
*308M Triggers collected while target was filling and solenoid ramping.
 +
*404M Triggers collected with target full and solenoid ramped.
 
* More details can be found here
 
* More details can be found here
 
** [https://logbooks.jlab.org/entry/4039073 0400-1000 08/09]
 
** [https://logbooks.jlab.org/entry/4039073 0400-1000 08/09]

Revision as of 07:58, 8 September 2022

Meetings are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)

MCC whiteboard

Hall D counting room white board

Hall D Logbook

Back to Run Coordination Meetings:Fall2022

Thursday, September 8

Past 24 hours

Issues

Plan