Difference between revisions of "Run Planning Meeting Notes, September 8 - September 14, 2022"
From GlueXWiki
m |
m (→Thursday, September 8) |
||
Line 17: | Line 17: | ||
**Replaced FCAL bases & one PMT: [https://logbooks.jlab.org/entry/4038778], [https://logbooks.jlab.org/entry/4038847] | **Replaced FCAL bases & one PMT: [https://logbooks.jlab.org/entry/4038778], [https://logbooks.jlab.org/entry/4038847] | ||
*LHe Target full and ready after ~11 hours, [https://logbooks.jlab.org/entry/4038896] | *LHe Target full and ready after ~11 hours, [https://logbooks.jlab.org/entry/4038896] | ||
+ | *308M Triggers collected while target was filling and solenoid ramping. | ||
+ | *404M Triggers collected with target full and solenoid ramped. | ||
* More details can be found here | * More details can be found here | ||
** [https://logbooks.jlab.org/entry/4039073 0400-1000 08/09] | ** [https://logbooks.jlab.org/entry/4039073 0400-1000 08/09] |
Revision as of 07:58, 8 September 2022
Meetings are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)
Hall D counting room white board
Back to Run Coordination Meetings:Fall2022
Thursday, September 8
Past 24 hours
- Maintenance day
- Work done in hall:
- Removed Be target, Installed He target and ramped magnet:
- Fixed connection for missing channels in ST:
- Replaced FCAL bases & one PMT: [1], [2]
- LHe Target full and ready after ~11 hours, [3]
- 308M Triggers collected while target was filling and solenoid ramping.
- 404M Triggers collected with target full and solenoid ramped.
- More details can be found here
Issues
Plan
- Rate+Trigger Studies (Sasha)
- Begin(continue) production on LHe Target @200nA