Difference between revisions of "Run Planning Meeting Notes, September 8 - September 14, 2022"

From GlueXWiki
Jump to: navigation, search
m (Thursday, September 8)
m (Past 24 hours)
Line 18: Line 18:
 
*LHe Target full and ready after ~11 hours, [https://logbooks.jlab.org/entry/4038896]
 
*LHe Target full and ready after ~11 hours, [https://logbooks.jlab.org/entry/4038896]
 
*[https://logbooks.jlab.org/entry/4038982 Extrapolations from harp scans]
 
*[https://logbooks.jlab.org/entry/4038982 Extrapolations from harp scans]
 
+
*[https://logbooks.jlab.org/entry/4039016 FCAL HV Correction for outliers]
 
*308M Triggers collected while target was filling and solenoid ramping.
 
*308M Triggers collected while target was filling and solenoid ramping.
 
*404M Triggers collected with target full and solenoid ramped.
 
*404M Triggers collected with target full and solenoid ramped.

Revision as of 08:11, 8 September 2022

Meetings are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)

MCC whiteboard

Hall D counting room white board

Hall D Logbook

Back to Run Coordination Meetings:Fall2022

Thursday, September 8

Past 24 hours

Issues

Plan