Difference between revisions of "Run Planning Meeting Notes, September 8 - September 14, 2022"

From GlueXWiki
Jump to: navigation, search
m (Past 24 hours)
m (Past 24 hours)
Line 15: Line 15:
 
**[https://logbooks.jlab.org/entry/4038926 Removed Be target], [https://logbooks.jlab.org/entry/4038959 Installed He target and ramped magnet]:  
 
**[https://logbooks.jlab.org/entry/4038926 Removed Be target], [https://logbooks.jlab.org/entry/4038959 Installed He target and ramped magnet]:  
 
**[https://logbooks.jlab.org/entry/4038961 Fixed connection for missing channels in ST]:
 
**[https://logbooks.jlab.org/entry/4038961 Fixed connection for missing channels in ST]:
**Replaced FCAL bases & one PMT: [https://logbooks.jlab.org/entry/4038778], [https://logbooks.jlab.org/entry/4038847]
+
**Replaced FCAL bases & one PMT (Malte): [https://logbooks.jlab.org/entry/4038778], [https://logbooks.jlab.org/entry/4038847]
 
*LHe Target full and ready after ~11 hours, [https://logbooks.jlab.org/entry/4038896]
 
*LHe Target full and ready after ~11 hours, [https://logbooks.jlab.org/entry/4038896]
 
*[https://logbooks.jlab.org/entry/4038982 Extrapolations from harp scans]
 
*[https://logbooks.jlab.org/entry/4038982 Extrapolations from harp scans]

Revision as of 08:21, 8 September 2022

Meetings are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)

MCC whiteboard

Hall D counting room white board

Hall D Logbook

Back to Run Coordination Meetings:Fall2022

Thursday, September 8

Past 24 hours

Issues

Plan