Line 16: | Line 16: | ||
**[https://logbooks.jlab.org/entry/4038961 Fixed connection for missing channels in ST]: | **[https://logbooks.jlab.org/entry/4038961 Fixed connection for missing channels in ST]: | ||
**Replaced FCAL bases & one PMT (Malte): [https://logbooks.jlab.org/entry/4038778], [https://logbooks.jlab.org/entry/4038847] | **Replaced FCAL bases & one PMT (Malte): [https://logbooks.jlab.org/entry/4038778], [https://logbooks.jlab.org/entry/4038847] | ||
− | *LHe Target full and ready after ~11 hours, [https://logbooks.jlab.org/entry/4038896] | + | *LHe Target full and ready after ~11 hours, [https://logbooks.jlab.org/entry/4038896] (Chris Carlin) |
*[https://logbooks.jlab.org/entry/4038982 Extrapolations from harp scans] | *[https://logbooks.jlab.org/entry/4038982 Extrapolations from harp scans] | ||
− | *[https://logbooks.jlab.org/entry/4039016 FCAL HV Correction for outliers] | + | *[https://logbooks.jlab.org/entry/4039016 FCAL HV Correction for outliers] (Igal) |
*308M Triggers collected while target was filling and solenoid ramping. | *308M Triggers collected while target was filling and solenoid ramping. | ||
*404M Triggers collected with target full and solenoid ramped. | *404M Triggers collected with target full and solenoid ramped. |
Revision as of 08:22, 8 September 2022
Meetings are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)
Hall D counting room white board
Back to Run Coordination Meetings:Fall2022
Thursday, September 8
Past 24 hours
- Maintenance day
- Work done in hall:
- Removed Be target, Installed He target and ramped magnet:
- Fixed connection for missing channels in ST:
- Replaced FCAL bases & one PMT (Malte): [1], [2]
- LHe Target full and ready after ~11 hours, [3] (Chris Carlin)
- Extrapolations from harp scans
- FCAL HV Correction for outliers (Igal)
- 308M Triggers collected while target was filling and solenoid ramping.
- 404M Triggers collected with target full and solenoid ramped.
- More details can be found here
Issues
- FDC-RF selftiming peak is missing
- Hall C will do BCM calibrations this afternoon, coordinate access to fix FDC TDCs with this?
Plan
- Rate+Trigger Studies (Sasha)
- Begin(continue) production on LHe Target @200nA