Difference between revisions of "Run Planning Meeting Notes, September 8 - September 14, 2022"
From GlueXWiki
m (→Thursday, September 8) |
m (→Plan) |
||
Line 37: | Line 37: | ||
**[https://logbooks.jlab.org/entry/4038871 Trigger rate scan (Be)] | **[https://logbooks.jlab.org/entry/4038871 Trigger rate scan (Be)] | ||
* Begin(continue) production on LHe Target @200nA | * Begin(continue) production on LHe Target @200nA | ||
+ | * Wednesday, 9/14: MCC plans to open the tunnel with the goal to bring up as much RF as possible. They plan to spend ~1.5 shifts for this. |
Revision as of 08:44, 8 September 2022
Meetings are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)
Hall D counting room white board
Back to Run Coordination Meetings:Fall2022
Thursday, September 8
Past 24 hours
- Maintenance day
- Work done in hall:
- Removed Be target, Installed He target and ramped magnet:
- Fixed connection for missing channels in ST:
- Replaced FCAL bases & one PMT (Malte): [1], [2]
- LHe Target full and ready after ~11 hours, [3] (Chris Carlin)
- Extrapolations from harp scans
- FCAL HV Correction for outliers (Igal)
- 308M Triggers collected while target was filling and solenoid ramping.
- 404M Triggers collected with target full and solenoid ramped.
- More details can be found here
Issues
- FDC-RF selftiming peak is missing
- Hall C will do BCM calibrations this afternoon, coordinate access to fix FDC TDCs with this?
Plan
- Rate+Trigger Studies (Sasha)
- Begin(continue) production on LHe Target @200nA
- Wednesday, 9/14: MCC plans to open the tunnel with the goal to bring up as much RF as possible. They plan to spend ~1.5 shifts for this.