m (Plan)
m (Issues)
Line 27: Line 27:
 
*Beam was unavailable for about 1 hour during the day shift due to [https://logbooks.jlab.org/entry/4039197 Hall C's BCM calibration]. We correlated the FCAL HV scan with this downtime.
 
*Beam was unavailable for about 1 hour during the day shift due to [https://logbooks.jlab.org/entry/4039197 Hall C's BCM calibration]. We correlated the FCAL HV scan with this downtime.
 
*Minor issue with one shift worker not showing up. Thanks to Karthik for taking that role on short notice.
 
*Minor issue with one shift worker not showing up. Thanks to Karthik for taking that role on short notice.
 +
*[https://logbooks.jlab.org/entry/4039398 EA LCW Oscillations giving rise to vertical orbit excursions in Hall D Beam]
 +
*[https://logbooks.jlab.org/entry/4039479 Trigger Timing change noted by Beni]
  
 
=== Plan ===
 
=== Plan ===

Revision as of 07:57, 9 September 2022

Meetings are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)

MCC whiteboard

Hall D counting room white board

Hall D Logbook

Back to Run Coordination Meetings:Fall2022

Friday, September 9

Past 24 hours

Issues

Plan

  • Continue taking production data at 200nA.
    • Production runs at small intensity (50nA and 100nA) over the weekend?
  • PrimEx Run Plan

Thursday, September 8

Past 24 hours

Issues

Plan