Difference between revisions of "Run Planning Meeting Notes, September 8 - September 14, 2022"

From GlueXWiki
Jump to: navigation, search
m (Past 24 hours)
m (Past 24 hours)
Line 12: Line 12:
 
=== Past 24 hours===
 
=== Past 24 hours===
 
*Production data at 200nA on the liquid He target.
 
*Production data at 200nA on the liquid He target.
*Trigger studies and rate scan performed by Sasha
+
*[https://logbooks.jlab.org/entry/4039521 Trigger studies] and [https://logbooks.jlab.org/entry/4039519 rate scan] performed by Sasha
 
**Added low-threshold trigger for FCAL (0.5GeV Trigger threshold)
 
**Added low-threshold trigger for FCAL (0.5GeV Trigger threshold)
 
**2 noisy FCAL channels were masked  
 
**2 noisy FCAL channels were masked  

Revision as of 08:35, 9 September 2022

Meetings are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)

MCC whiteboard

Hall D counting room white board

Hall D Logbook

Back to Run Coordination Meetings:Fall2022

Friday, September 9

Past 24 hours

Issues

Plan

  • Continue taking production data at 200nA.
    • Production runs at small intensity (50nA and 100nA) over the weekend?
  • PrimEx Run Plan

Thursday, September 8

Past 24 hours

Issues

Plan