Difference between revisions of "Run Planning Meeting Notes, September 8 - September 14, 2022"

From GlueXWiki
Jump to: navigation, search
m (Past 24 hours)
m (Past 24 hours)
Line 47: Line 47:
 
*308M Triggers collected while target was filling and solenoid ramping.
 
*308M Triggers collected while target was filling and solenoid ramping.
 
*404M Triggers collected with target full and solenoid ramped.
 
*404M Triggers collected with target full and solenoid ramped.
* More details can be found here
+
* Shift Summaries:
 
** [https://logbooks.jlab.org/entry/4039073 0400-1000 08/09]
 
** [https://logbooks.jlab.org/entry/4039073 0400-1000 08/09]
 
** [https://logbooks.jlab.org/entry/4039023 2200-0400 07/09-08/09]
 
** [https://logbooks.jlab.org/entry/4039023 2200-0400 07/09-08/09]

Revision as of 08:38, 9 September 2022

Meetings are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)

MCC whiteboard

Hall D counting room white board

Hall D Logbook

Back to Run Coordination Meetings:Fall2022

Friday, September 9

Past 24 hours

Issues

Plan

  • Continue taking production data at 200nA.
    • Production runs at small intensity (50nA and 100nA) over the weekend?
  • PrimEx Run Plan

Thursday, September 8

Past 24 hours

Issues

Plan