Difference between revisions of "Run Planning Meeting Notes, September 8 - September 14, 2022"

From GlueXWiki
Jump to: navigation, search
m (Past 24 hours)
m
Line 8: Line 8:
  
 
Back to [[Run Coordination Meetings:Fall2022]]
 
Back to [[Run Coordination Meetings:Fall2022]]
 +
 +
=Friday, September 9=
 +
=== Over the Weekend ===
 +
*Active collimator checkout at 2nA beam current.
 +
*Production data at 200nA on the liquid He target.
 +
**2.7B total triggers collected last 24 hours
 +
*[https://logbooks.jlab.org/entry/4040338 Timing calibrations updated by Sean]
 +
*Beam was down for ~5hours early Monday morning. We took raw cosmics data during this time:
 +
**Run numbers: 110721-110723 (9.8M events)
 +
*Shift summaries:
 +
** [https://logbooks.jlab.org/entry/4039447 0400-1000 09/09]
 +
** [https://logbooks.jlab.org/entry/4039386 2200-0400 08/09-09/09]
 +
** [https://logbooks.jlab.org/entry/4039283 1600-2200 08/09]
 +
** [https://logbooks.jlab.org/entry/4039161 1000-1600 08/09]
 +
** [https://logbooks.jlab.org/entry/4039073 0400-1000 08/09]
 +
 +
=== Issues ===
 +
*FCAL
 +
 +
=== Plan ===
 +
*Empty Target, take TAC Run
 +
*Continue taking empty-target data until Maintenance day on Wednesday
 +
  
 
=Friday, September 9=
 
=Friday, September 9=

Revision as of 08:02, 12 September 2022

Meetings are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)

MCC whiteboard

Hall D counting room white board

Hall D Logbook

Back to Run Coordination Meetings:Fall2022

Friday, September 9

Over the Weekend

Issues

  • FCAL

Plan

  • Empty Target, take TAC Run
  • Continue taking empty-target data until Maintenance day on Wednesday


Friday, September 9

Past 24 hours

Issues

Plan

  • Continue taking production data at 200nA.
    • Production runs at small intensity (50nA and 100nA) over the weekend?
  • PrimEx Run Plan

Thursday, September 8

Past 24 hours

Issues

Plan