m (Issues)
m (Over the Weekend)
Line 17: Line 17:
 
*Beam was down for ~5hours early Monday morning. We took raw cosmics data during this time:
 
*Beam was down for ~5hours early Monday morning. We took raw cosmics data during this time:
 
**Run numbers: 110721-110723 (9.8M events)
 
**Run numbers: 110721-110723 (9.8M events)
 +
*Beam down for ~1hour Saturday during swing shift, took cosmics run:
 +
**Run number: 110701 (2.5M events)
 
*Shift summaries:
 
*Shift summaries:
 
** [https://logbooks.jlab.org/entry/4040417 0400-1000 12/09]
 
** [https://logbooks.jlab.org/entry/4040417 0400-1000 12/09]

Revision as of 08:22, 12 September 2022

Meetings are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)

MCC whiteboard

Hall D counting room white board

Hall D Logbook

Back to Run Coordination Meetings:Fall2022

Monday, September 12

Over the Weekend

Issues

  • FCAL Bases:
    • Had to reset a few bases throughout the weekend using standard procedure. One base (35,5) was not responding to power-reset and Malte will investigate next access.
    • Another base not holding HV and needs to be replaced next access
  • CDC AI turned off per Naomi's request.

Plan

  • Empty Target, take TAC Run
  • Continue taking empty-target data until Maintenance day on Wednesday

Friday, September 9

Past 24 hours

Issues

Plan

  • Continue taking production data at 200nA.
    • Production runs at small intensity (50nA and 100nA) over the weekend?
  • PrimEx Run Plan

Thursday, September 8

Past 24 hours

Issues

Plan