*Active collimator checkout at 2nA beam current.
 
 
*Production data at 200nA on the liquid He target.
 
*Production data at 200nA on the liquid He target.
**2.7B total triggers collected last 24 hours
+
**12.8B total triggers collected on LHe target (started Thursday morning)
 +
*Active collimator checkout at 2nA beam current.
 
*[https://logbooks.jlab.org/entry/4040338 Timing calibrations updated by Sean]
 
*[https://logbooks.jlab.org/entry/4040338 Timing calibrations updated by Sean]
 
*Beam was down for ~5hours early Monday morning. We took raw cosmics data during this time:
 
*Beam was down for ~5hours early Monday morning. We took raw cosmics data during this time:

Revision as of 08:27, 12 September 2022

Meetings are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)

MCC whiteboard

Hall D counting room white board

Hall D Logbook

Back to Run Coordination Meetings:Fall2022

Monday, September 12

Over the Weekend

Issues

  • FCAL Bases:
    • Had to reset a few bases throughout the weekend using standard procedure. One base (35,5) was not responding to power-reset and Malte will investigate next access.
    • Another base not holding HV and needs to be replaced next access
  • CDC AI turned off per Naomi's request.

Plan

  • Empty Target, take TAC Run
  • Continue taking empty-target data until Maintenance day on Wednesday

Friday, September 9

Past 24 hours

Issues

Plan

  • Continue taking production data at 200nA.
    • Production runs at small intensity (50nA and 100nA) over the weekend?
  • PrimEx Run Plan

Thursday, September 8

Past 24 hours

Issues

Plan