All public logs
From GlueXWiki
Combined display of all available logs of GlueXWiki. You can narrow down the view by selecting a log type, the username (case-sensitive), or the affected page (also case-sensitive).
(newest | oldest) View (newer 50 | older 50) (20 | 50 | 100 | 250 | 500)- 10:54, 30 April 2013 Elton (Talk | contribs) uploaded File:Read transmission mod47 mod10.pdf (Transmission tests of module 47 and 10)
- 07:52, 25 April 2013 Elton (Talk | contribs) uploaded File:Beam rates cpp.pdf (Hadronic Rates for pion polarizability with coherent peak at 6 GeV)
- 17:36, 23 April 2013 Elton (Talk | contribs) uploaded File:Athens update April23.pdf (Update from Athens on April 23, 2013)
- 13:27, 23 April 2013 Elton (Talk | contribs) uploaded File:Fcal lambdaI.pdf (Computation of the LGD pion interaction length)
- 18:12, 18 April 2013 Elton (Talk | contribs) moved page Mar 14, 2013 SiPM Electrical and Cooling to Apr 18, 2013 SiPM Electrical and Cooling (update date)
- 07:37, 18 April 2013 Elton (Talk | contribs) uploaded File:Plot piprob.pdf (Plot pion probability using prior information)
- 10:41, 2 April 2013 Elton (Talk | contribs) uploaded File:BCAL alignment9 pads.JPG
- 10:41, 2 April 2013 Elton (Talk | contribs) uploaded File:BCAL alignment9 side.JPG
- 10:40, 2 April 2013 Elton (Talk | contribs) uploaded File:BCAL alignment9 base.JPG
- 08:04, 2 April 2013 Elton (Talk | contribs) uploaded File:BCAL installation9 overview.JPG
- 08:04, 2 April 2013 Elton (Talk | contribs) uploaded File:BCAL installation9 side.JPG
- 08:03, 2 April 2013 Elton (Talk | contribs) uploaded File:BCAL installation9 front.JPG
- 07:52, 19 March 2013 Elton (Talk | contribs) uploaded File:SiPM serial numbers.png (List of First article samples)
- 10:11, 12 March 2013 Elton (Talk | contribs) uploaded File:Cage3.JPG (Right side of cage on end of BCAL module)
- 10:10, 12 March 2013 Elton (Talk | contribs) uploaded File:Cage2.JPG (Front view of cage on end of BCAL module)
- 10:10, 12 March 2013 Elton (Talk | contribs) uploaded File:Cage1.JPG (Right side of cage on end of Bcal)
- 18:19, 5 March 2013 Elton (Talk | contribs) moved page Feb 26, 2013 Calorimetry to Mar 12, 2013 Calorimetry (correct date)
- 17:33, 28 February 2013 Elton (Talk | contribs) moved page Jan 10, 2012 SiPM Electrical and Cooling to Jan 10, 2013 SiPM Electrical and Cooling (wrong year)
- 16:40, 13 February 2013 Elton (Talk | contribs) moved page Feb 14, 2012 SiPM Electrical and Cooling to Feb 14, 2013 SiPM Electrical and Cooling (wrong year)
- 16:39, 13 February 2013 Elton (Talk | contribs) moved page Jan 31, 2012 SiPM Electrical and Cooling to Feb 14, 2012 SiPM Electrical and Cooling (new date)
- 11:32, 12 February 2013 Elton (Talk | contribs) uploaded File:Run638 cosmic fadc Mod41.pdf (Overnight cosmic-ray run for module 41, showing mip peak. )
- 13:41, 6 February 2013 Elton (Talk | contribs) uploaded File:Gluing11.JPG (Use of height gauge to verify length of light guides)
- 13:39, 6 February 2013 Elton (Talk | contribs) uploaded File:Gluing10.JPG (Wand on module ready to push light guides into position)
- 13:38, 6 February 2013 Elton (Talk | contribs) uploaded File:Gluing9.JPG (Cleaning up after two columns glued onto module)
- 13:37, 6 February 2013 Elton (Talk | contribs) uploaded File:Gluing8.JPG (Transfer of guides with wand onto module)
- 13:36, 6 February 2013 Elton (Talk | contribs) uploaded File:Gluing7.JPG (Light guides ready on wand)
- 13:34, 6 February 2013 Elton (Talk | contribs) uploaded File:Gluing6.JPG (Bobby and Tina preparing to glue)
- 18:03, 22 January 2013 Elton (Talk | contribs) uploaded File:Gluing5.JPG (Downstream end of module 45 with 2 columns glued. Shown is the monitoring string secured with Kapton tape)
- 11:55, 22 January 2013 Elton (Talk | contribs) uploaded File:Gluing4.JPG (All columns glued on to module 45.)
- 11:53, 22 January 2013 Elton (Talk | contribs) uploaded File:P1010007.JPG (LED boards mounted onto first column module 45)
- 11:53, 22 January 2013 Elton (Talk | contribs) uploaded File:Gluing2.JPG (Front face without flash module 45)
- 11:52, 22 January 2013 Elton (Talk | contribs) uploaded File:Gluing1.JPG (Front face of module 45 )
- 08:38, 15 January 2013 Elton (Talk | contribs) uploaded File:Light Intensity blue 130x130.pdf (FCAL monitoring tests. Light Intensity blue 130x130)
- 08:37, 15 January 2013 Elton (Talk | contribs) uploaded File:Reflectance test 1.pdf (Testing of FCAL monitoring boards. reflectance test)
- 10:03, 10 January 2013 Elton (Talk | contribs) uploaded File:Capacitance temperature.gif (Capacitance per cell for 1769 tested SiPMs)
- 17:10, 5 December 2012 Elton (Talk | contribs) moved page Nov 15, 2011 SiPM Electrical and Cooling to Dec 5, 2011 SiPM Electrical and Cooling (change date)
- 17:39, 15 November 2012 Elton (Talk | contribs) uploaded File:HallB beamtest periods.pdf (Beam current in nA as a function of time for the BCAL beam test in Hall B 2012.)
- 13:47, 16 October 2012 Elton (Talk | contribs) uploaded File:Light Guides Oct16.png (status of light guide production on Oct 16, 2012.)
- 15:37, 15 October 2012 Elton (Talk | contribs) moved page Oct 2, 2012 Readout to Oct 16, 2012 Readout (change date)
- 17:48, 12 October 2012 Elton (Talk | contribs) uploaded File:PF1010003.JPG (LEDs located on the front face of third row from bottom (T3) to simulate illumination from the light guide input. The horizontal bar is placed across the input face of the light guide.)
- 11:16, 11 October 2012 Elton (Talk | contribs) moved page Oct 11, 2011 SiPM Electrical and Cooling to Oct 18, 2011 SiPM Electrical and Cooling (change date for cancelled meeting)
- 12:07, 10 October 2012 Elton (Talk | contribs) uploaded File:Pip pim nominal hydrogen vertex.pdf (Plots of generated and reconstructed kinematic variables of pi+ and pi- for 10k events generated on the nominal 30 cm hydrogen target at 65 cm. Reconstruction includes a vertex constraint)
- 10:05, 9 October 2012 Elton (Talk | contribs) uploaded File:Pip pim nominal hydrogen.pdf (Plots of kinematic variables for pi+ and pi- for 100k generated events for the nominal 30 cm hydrogen target at its nominal position.)
- 08:25, 2 October 2012 Elton (Talk | contribs) uploaded File:Reunion 2oct JSA-11-C0365.pdf (Status of light guide fabrication as of Oct 2, 2012)
- 10:47, 11 September 2012 Elton (Talk | contribs) uploaded File:BCAL results from first 20 strips 11 09 2012.pdf (BCAL_results_from_first_20_strips_11_09_2012.pdf Monitoring)
- 13:46, 15 August 2012 Elton (Talk | contribs) uploaded a new version of File:LED glue3.JPG (Jig for LED gluing / cards with residue glue after gluing and removal)
- 13:46, 15 August 2012 Elton (Talk | contribs) uploaded File:LED glue3.JPG (Jig for LED gluing / cards with residue glue after gluing and removal)
- 13:45, 15 August 2012 Elton (Talk | contribs) uploaded File:LED glue2.JPG (Jig for LED gluing / side view perspective)
- 13:44, 15 August 2012 Elton (Talk | contribs) uploaded File:LED glue1.JPG (Jig for LED gluing / side view)
- 11:24, 1 August 2012 Elton (Talk | contribs) uploaded File:LED light3.JPG (LED flashing, same column opposite end of mini-Bcal)